precast pile cap
in order to achieve shortest down time, project engineers are requesting to explore the possibility of installing precast pile cap on a group of piles. pile cap size will be quite large - over all size may be 3m x 14m.
i designed pile caps before but never used a precast pile cap. a theoretical solution may be possible, but installation of the concept in real life could be a real challenge.
any suggestion / advise on this matter will be of immense help to me.

possible but not much potential savings in cost, some savings in time is possible. the amount cost for formwork, concrete and rebar installation is similar whether or not done in the factory of in the field. prestressing can be easily done in the field.
ask the project engineers for their ideas/design and assess if it will work.
the difficulty is not on the cap design, is at the pile-cap interface. connection details (such as special reinforcing/embedments/grouting) and feasibility/ease of construction are the keys. if there is no one in the company has done it before, suggest to talk to a few experienced contractors during the project development stage.
i have a drawing that i can post when i get back to the office in a day or so. it's a precast cap beam for a pile bent. it's been a while but i'd say it's about 5' wide x 4' deep x about 70' long - it two pieces. it sits on 5' diameter drilled shafts.
it's for a bridge over a waterway; it you think it'll be useful let me know.
anyway, if your cap is 3 x 14 x d, it's not exactly the easiest thing to ship and lift. on my bridge job, everything is shipped by barge from fabricator to erector.
thank you all for your suggestions. i am not very keen to do this before getting a complete brief. my biggest concern is the connection, as kslee1000 has commented.
bridgebuster, any reference drawing will be very important for my design development and discussion. please forward me the copy of the drawing you mentioned. yes, the size is a problem for lifting. if this concept really goes ahead, i will be inclined to split the raft in 3 sections and design the connection(s)separately. just a thought.
here they are; the file contains three drawings.
good luck.
bridgebuster - thanks a lot for the information. i will study them now.
you're welcome.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast concerete pile cap and embedded plate huangyhg 产品功能分析 0 2009-09-15 02:13 PM
pile cap huangyhg 产品功能分析 0 2009-09-15 12:22 PM
pile cap and grade beam huangyhg 产品功能分析 0 2009-09-15 12:19 PM
h pile huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM


所有的时间均为北京时间。 现在的时间是 12:27 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多