几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 01:35 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 possible foundation decay

possible foundation decay
you do not say how deep or wide the swale is...that would make a difference. in general, the foundation in your area must be at a depth that would preclude frost heave. the swale might have to be filled in order to achieve this, thus creating a change in the site drainage characteristics. if the swale is not filled, you will have water running by your foundation and the potential to erode the overlying soils, thus exposing the foundation is greater. this, obviously, is not a good thing! agree with "darct" that subsurface drainage could be done, but that would be expensive. filling and re-routing the swale around the structure by re-grading would be the most practical solution if you can't get a variance. be sure the fill extends significantly beyond the structure so that you don't run into steep slopes and erosion issues created by the fill.
if this swale is a natural drainage feature of your neighborhood, you could have big problems trying to rerout or backfill it. there could be lawsuits from the city and your neighbors if the natural drainage is altered to an extent that damage occurs to other property. if you really like the lot, i would use the frank lloyd wright approach to solving this problem. have your architect rework the floor plan such that the house cantilevers over the swale or bridges in some acceptable fashion. good luck!
jae (visitor)9 may 00 19:31
i generally agree with the above comments. one additional point:
your main thrust seem to be to convince the governing authority to allow you the smaller setback, thus allowing construction on an appropriate location on the property which avoids all of the pitfalls listed above. this is the kiss (keep it simple stupid) solution. also the most practical and economic solution as well. to help convince the authority that a building shouldn't/couldn't be positioned over the swale, a geotechnical engineer can certainly help provide you with a letter report outlining the issues and concerns regarding drainage re-routing, foundation settling, etc.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
mat foundation huangyhg 产品功能分析 0 2009-09-10 01:10 PM
foundation wall tied to s.o.g huangyhg 产品功能分析 0 2009-09-09 01:39 PM
foundation cracking and settling huangyhg 产品功能分析 0 2009-09-09 01:24 PM
crack in foundation wall huangyhg 产品功能分析 0 2009-09-08 02:20 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM


所有的时间均为北京时间。 现在的时间是 06:49 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多