pemb relocation
here's a new one for the books:
i've been asked to propose on design and construction services for a 40,000+ sf pemb that was originally manufactured for a location and end use that are different from that required by the present owner. the components are crated up on the new site and need a foundation and cladding.
other than determining if the structure will work for the environmental loads at the new location and if the maximum drift will be compatible with the new use, what other considerations (or cautions) would you have with this?
any and all advice would be greatly appreciated.
-jack

the program used to "pre-engineer" the metal building needs to be known for the determination of what loads were anticipated for this structure. change of site and cladding may make the pieces understrength and require enormous effort to modify to make code requirements. without this specific data, you will spend more in engineering time than any savings generated by using a packaged product.
it's a simple pass/fail check assuming they are not changing the structure or end use. if the design criteria for the new site is less than or equal the original then they are fine.
but i agree with civilperson, it would be nearly impossible to prove that it is acceptable for worse wind/snow/seismic conditions since they are designed so tight.
ctseng:
it may not be that simple, depending on the age of the pemb, as code steel frame requirements have changed with time.
jacktrades:
an additional consideration would be a possible change in building useage, affecting fire requirements, sprinklering, insulation, etc.
mike mccann
mmc engineering
thanks to all of you for your advice.
i've recently found that there are shop drawings which supposedly indicate the loads for which the structure was designed and that they'll be made availble soon. also, i believe that this is a relatively new (2 years) design and so should hopefully fall under the latest code provisions.
msquared48 - very good point. a change in use might dicate a greater mechanical and insulation loading capacity requirement. i missed that one completely.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pemb interior columns huangyhg 产品功能分析 0 2009-09-15 12:00 PM
pemb foundation design loads huangyhg 产品功能分析 0 2009-09-15 11:59 AM
pemb fnd design notes huangyhg 产品功能分析 0 2009-09-15 11:59 AM
how do you work with pemb manufacturers huangyhg 产品功能分析 0 2009-09-09 05:25 PM
design build pemb foundations huangyhg 产品功能分析 0 2009-09-08 05:13 PM


所有的时间均为北京时间。 现在的时间是 12:56 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多