默认 multi-story wood shearwalls

multi-story wood shearwalls
we have several wood building projects ranging from 3-5 stories. due to high lateral forces, many shearwalls are required especially within the interior of the building. the question posed to this fine forum is how to handle the shear transfer from one wall segment to the segment at the next floor below (the walls in question are interior demising walls and are contiguous within their vertical plane). our solution was to have the sheathing be continuous through the height of the shearwall. unfortunately, that prevents the floor framing from bearing on top of the wall (the floor framing is perpendicular to the wall for these shearwalls). a horizontal nailer could be nailed to the face of the shearwall to support the floor framing, but the contractor thought we were insane.
the floor framing is 12"-24" deep depending upon the floor. there is a gap between the floor diaphragm and the shearwall below if the floor framing must bear on top of the wall. we are arguing that something has to be provided to transfer the shear across this gap (sheathing, blocking, bracing, etc.) and to prevent rolling of the floor framing. what is typically done to transfer the shear across this gap?
have a look at this:
here are a couple of sites to review on this topic:
it is definitely a good article but appears to address mainly with the transfer of the c/t force and not the shear force (i did not read the whole thing to be honest). however, the detail provided in the article does show solid blocking to transfer the shear force to the next segment below. the issue we are facing is a gap up to 24" due to the floor framing interupting the shearwall. thanks!
thanks jae. the figure for the simpson ctd33 (your second link from the top) shows graphically the situation. simpson specifies "solid blocking" in order to transfer the shear across the gap and prevent rolling of the floor framing. this blocking would have to occur between each floor framing member if those
have you thought about fire seapration requirements between these units? this may also dictate what you available options are.
dengebre - for interior partition shear walls, a common solution to this problem where the floor joists are continuous across the bearing wall is to place truss blocking between each floor joist. have the truss manufacturer design the shear transfer (truss) block for a shear force equal to the capacity of the lower wall on your plans and you should remain relatively conservative.
kbvt
1) excellent idea for trusses! for my own education, is this a "truss block" an actual truss that fits in between the floor trusses?
2) what if the floor is lvl's?
thanks!!
i was going to suggest the same regarding the shear transfer truss. i have used these before and they fit in between the main floor trusses. you might could also use blocking and metal straps between the floor trusses to transfer the shear, but i expect the pre-made truss would be a lot easier.
you should be able to use some of the details that are in the links above that show solid blocking if the floor uses lvl's.
i have also used 1" thick plywood as blocking in the past.
daveatkins
everyone - thank you very much for the excellent responses. i am adding this to the thread for future searchers of this forum:
some excellent illustrative examples are shown in thor matteson's book "wood-framed shear wall construction". figures 23-25 on page 30 show exactly the problem i was trying to describe. the best solution is to introduce "truss frames" (fig. 25) in between the floor framing (aka, the truss blocks described above). an alternate to that, but allegedly not as good, is to use blocking (fig. 24). bottom line is that something must be provided to transfer the shear from the floor diaphragm across the gap into the wall sheathing.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
multi story wood structure stud wall plates huangyhg 产品功能分析 0 2009-09-10 03:26 PM
multi story wood construction huangyhg 产品功能分析 0 2009-09-10 03:26 PM
line up multi-story wood studs and trusses huangyhg 产品功能分析 0 2009-09-10 10:40 AM
brick veneer on 4-story wood bldg huangyhg 产品功能分析 0 2009-09-07 04:57 PM
5 story wood building huangyhg 产品功能分析 0 2009-09-07 08:50 AM


所有的时间均为北京时间。 现在的时间是 12:27 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多