几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 12:46 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 masonry reinforcing

masonry reinforcing
what is the min. splice length for reinforcing in masonry? where is this information? either it isn't in aci 530, or i skipped right over it.
i do not have the most recent version of aci 530, but in section 8.5.7.1.1, it says 0.002 times the bar diameter times the allowable stress in the reinforcing. with grade 60 reinforcing, this works out to be 48 bar diameters.
daveatkins
thanks a 10^6- in the 1999 version, the new section is 2.1.8.6.1.1. there is a handy-dandy ref. chart referring 95 version sections to appropriate 99 sections (it is in the back of the 99 version).
thanks again
aci 530 stipulates 48 bar diameter. also a side note that most engineers do not know, a splice of bars can be in two adjacent cells (yes) per aci 530!!!! they do not have to be in the same cell. it is preferred but not necessary.
good luck
not sure if you are also working under the ibc but it overrides aci's laps for working stress design (ibc-2000 2107.2.3) and can control the final legnth.
also re
48 bar diameters. i also can give you a little known fact that most engineers do not know or are aware of, aci 530 allows the vertical bars, when splicing, to be in adjacent cells. they do not have to be in same cell!!
to find this out, read aci 530 closely.
i hope this helps
fyi,
i always call out an extra 3" to 6" inches of lap, depending on the height of the wall, between the dowels coming out of the footing and wall reinforcment. the reason i do this is, depending on how sloppy the mason is, there can be a significant amount of mortar that falls down the cells prior to grouting the wall.
chip
chipb,
this is one of the reasons you have clean outs at the bottom of the walls/lifts. before the cells are filled, you can inspect them. also you can inspect them after the grout is placed to confirm solid core grouting.
mmot is correct. the lap lengths under the ibc can be much greater. for example, a #6 bar in 8" cmu would be approximately 65" instead of the 36" required by aci 530-99. does anyone know the rationale behind this? has this been a failure mode? i doubt it. based on earlier responses in this thread, are other engineers sticking with aci and ignoring the ibc requirements?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
masonry reinforcing placemen huangyhg 产品功能分析 0 2009-09-10 12:46 PM
masonry reference huangyhg 产品功能分析 0 2009-09-10 12:45 PM
masonry cemen huangyhg 产品功能分析 0 2009-09-10 12:28 PM
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
arching of masonry walls huangyhg 产品功能分析 0 2009-09-07 12:41 PM


所有的时间均为北京时间。 现在的时间是 02:24 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多