几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 12:14 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 making budgets and work quality

making budgets and work quality
where i work, it seems to be more important to make budget than to produce quality drawings. i think it is kind of unfortunate that we have to lower fees so much, that i have to feel like i am throwing something together as fast as i can everytime. the only good part is we seem to keep work coming in by this philosophy.
i am somewhat scared of this, being in structures i would like to have a chance to double check everything but i just can't.anyone else share these feelings?
find a job or post a job opening
while i can appreciate your feelings, my company stresses a systematic quality check which must be included in the fee estimate. this doesn't mean, however, that plans go out of our office without a lot of stress at the last minute. but i am comfortable when they do go out that they are sound.
many of our clients expect this and will often ask for a copy of our quality assurance qualilty control program.
i recommend that you start something like this. and perhaps you do already to some extent. we find that the check will go pretty quick and doesn't eat up too much budget. of course, the reward is not seeing the plans or plan sheets for a second, third or even greater times.
it reduces contractor complaints and if you've been in the business long you'll agree that the one person an owner listens to is the person building the job. all he has to do is say "oh crap, these guys made another mistake - that's gonna cost you!". and the next thing you know, that owner is off down the street at the next firm.
good luck.
that sounds great, how large of a company do you work for?
heynewp,
you're not alone. it seems like most offices operate the same way. sometimes i think there's too much importance placed on "managing" a project rather than "engineering" a project. i hate to say how much crap goes out of my office. when i started 20+ years ago things were different. nothing left the office unchecked but that's not to say that everything was perfect. with all the emphasis placed these days on "project management" and "quality control" it looks like we've lulled ourselves into a false sense of security. anyway, time to get off my soapbox.
haynewp,
i work for a large company of about 30k plus workers around the world.
we simply include a check as part of our estimate and as i said, since a check requires an experienced person, not only are the numbers checked but the methodology is too. an experienced person should be able to do that efficiency. younger engineers are constantly mentored and an eye kept on them to avoid designs going astray.
we have a sheet that sits atop any set of design computations that shows who originated, checked, updated and backchecked those documents.
it is a way of life for our people. its also very similar to the old "two sets of eyes will review every document that leaves this office" mandate that i was used to many, many years ago as a new engineer. the only exception is that we are forced to document that process.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 06:02 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多