默认 high mast lighting sq footing cut rebar

high mast lighting / sq footing / cut rebar
am doing the special inspection work on new high school football stadium. the high mast lighting was originally to be placed in deep augured holes but due to encountering rock several were redesigned and are to placed on spread footings.
the footings have # 5 @ 18" ew top and depending on the size of footings a specified number #6 ew bottom. the drawing appears to show the pre-cast concrete mast standing vertically through both mats of rebar. so the contractor simply cuts a round hole through both mats of rebar so that the mast can rest on the bearing elevation of the footing.
ok, not much weight, but depending on the number of lights lots of moment. but the # 6 bottom mat has a hole cut in it? does that sound right?
just want a heads-up before i ask the eor.

check out our whitepaper library.
if i understand correctly, the precast pole is to be embedded in the spread footing prior to concrete placement. if this is the case, it is correct to cut hole on the top steel mat, but i would set the pole at a distance above the bottom mat to ensure failure through punching shear or bending will not occur.

i would assume that it's not correct, unless informed otherwise by the designer.
sounds funny to me.
how is the attachment of the light pole made to the footing to develop the overturning moment capacity of the footing? sounds like the only link to the footing from the lightpole is through shear...
seems to me that rock bolts should be used here for better anchorage to the rockmass, in addition to the spread footing.
mike mccann
mmc engineering
the pre-cast pole is to be placed through the two mats of rebar so that it rests on the dirt. there is a circle of vertical hooked dowels around the base of the pole extending about 4 or 5' above the top of footing. so there is a secondary concrete placement for what would look a lot like a pier in any other case.

just fyi, the eor advised that the detail had been misinterpreted and that the bars were not to be cut. just as we thought.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
footing is too small for residential addition1 huangyhg 产品功能分析 0 2009-09-09 01:04 PM
development of flexural reinforcement in footings and pile c huangyhg 产品功能分析 0 2009-09-08 06:31 PM
demolition of existing wall footing to install column huangyhg 产品功能分析 0 2009-09-08 05:07 PM
can use steel beams instead of rebar for my reinforcemen huangyhg 产品功能分析 0 2009-09-07 10:25 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 02:08 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多