几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 01:22 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 foundation anchorage rehab

foundation anchorage rehab
i have recently learned that in many new residences being constructed the homes are not at all anchored to the foundation. there are no anchor bolt connections between the sill plate and the cmu stemwall. additionally, stemwalls are not fully grouted or grouted at set intervals. since these homes are being built outside of city limts, where no building codes are enforced, there is little if any recourse for homeowners, just learning of this problem, to take. does anyone have any good ideas about a way to create adequate anchorage of the home to the foundation when the house is already constructed.
i have two main ideas...
1. drill holes into the tops of cmu blocks and sill plates, insert anchors into sill plate as they should be, and pump concrete into cmu block hole to grout block without removing sill plate.
2. use a strap to tie the sill plate to the cmu block nailing into the wood and using enough titen hd screws into the hollow block to resist the necessary loads.
does this sound reasonable and do you have a better idea?
p.s. as always, cost is an factor to homeowners. the more economical option is always the best in their eyes.
there usually isn't enough clearance to hammer drill if joists are dimensional lumber so use
aueng06,
just because there is noe enforcement does not mean that they have no recourse. this is an obvious code violation that should be brought to the attention of the relevant state department.
to tie the cmu to the footing, you could knock out the face shell for the lower couple of blocks (hopefully below ground level) ever 4 or 6' drill and epoxy grout anchor bars at an angle then bend them to vertical. fill the core with grout and patch up.
regards
csd
i suspect "where no building codes are enforced" meant "where are are no required building codes" as well, so there isn't anything to report to the state.
how about those bolts with screen tube that simpson use?
no code does not mean there is no minimum standard of care for the builder. an attorney should be able to make a case that a building code is a minimum standard of care and any home constructed in the united states, regardless of building code, should meet or exceed the 2006 irc.
don phillips
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
footing foundation design reference huangyhg 产品功能分析 0 2009-09-09 01:03 PM
fieldstone foundation rehab huangyhg 产品功能分析 0 2009-09-09 11:43 AM
crack in foundation wall huangyhg 产品功能分析 0 2009-09-08 02:20 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM
apa narrow wall anchorage huangyhg 产品功能分析 0 2009-09-07 12:27 PM


所有的时间均为北京时间。 现在的时间是 04:46 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多