几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 12:58 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 flotation calcs

flotation calcs.
what is the usual flood recurrence used to check flotation of structures? what safety factors are associated with what periods of occurence? also, can you recommend references that address bouyancy checks?
i think that your starting point is the design life of your structure. if your structure is designed to operate for (say) 60 years, you don't necessarily need to design for a 1 in 60 year flood event. you need to perform some form of risk analysis to this in conjunction with your client and ask the client what risks he/she is prepared to accept in terms of the structure becoming buoyant.
once the flood return period is set (say 1 in 30 year flood) then you will have your design water level from your hydrograph. the minimum factor of safety you need to prevent buoyancy at this floodwater level is 1.1. this may seem low, but water is a known fluid of specific density (which changes very little). also, note that 1.1 is a minimum factor of safety.
regards
andy machon


if there is no water expected, design for water 1 m above bottom of structure, or 1/3 of depth below ground surface, which ever is worse.
if there is any water expected, design for water 1/4 of depth of structure below ground surface.
water may come from burst mains, climatic change etc., so design for the "water expected" situation, or provide external drainage system. alternatively advise the client against having a basement.
if designing a bridge structure in a rural situation please keep in mind that it is acceptable for the structure to be overtopped, especially if the grade of the existing is not to be improved much (i.e., improving the grade of the roadway will cost much, much more than is available). in designing for this case provisions must be made to vent the structure and resist uplift.
gglass,
flood reccurence of say 1:5 is okay. the water table fluctuation will allow u to fix the maximum level. piezometer can be installed on site for monitoring this.
depending on the location where u intend/propose to carry out construction, your local meteorolgical dept. will give u sufficient information on flooding propensity.
water table during any flood allows for 100% saturation of the soil. but water above the ground level assists.
factor of safety for buoyancy check should be taken as 2.
this takes into account probable rise in gwt.
resisting forces against vertical upthrust is the weight of the building. for small structures this is sometimes a problem. the upthrust is actually surface area of the building that interfaces with the ground x the depth of maximum water table x 10kn/m3.
for basements, provision of relief drains become important if it has slab on grade with joints.
(also look for articles or reference on pore water dissipation.)
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
engineered shop drawings huangyhg 产品功能分析 0 2009-09-08 10:28 PM
dimension to neutral axis in beam calcs huangyhg 产品功能分析 0 2009-09-08 06:49 PM
cheating on retaining wall calcs huangyhg 产品功能分析 0 2009-09-07 11:25 PM
olerance calcs huangyhg tec-ease(America) 0 2009-09-05 01:27 PM
【转帖】olerance calcs yang686526 American standards 0 2009-05-04 10:49 AM


所有的时间均为北京时间。 现在的时间是 08:56 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多