默认 design build - sheet piles

design build - sheet piles
i am trying to find out more information about the design build process, in particular for sheet piles. currently our intent for a project is to have sheet piles design build.
i assume i need to provide information such as: groundwater elevation if appropriate, basic geotechnical information (soil unit weight, cohesion and friction angle) and cross sections.
where is this information typically placed and in what format? would i include this information in the drawings or is typically a contract writen for design build? would i be involved with the speficiations or is this something i would leave up for the firm to take care of.
appreicate you feedback and guidance.
thanks

you basically need to provide a performance spec the piling, which would include all the design parameters. this could either be in the normal spec book, or could be just in the form of notes on the drawings.
i assume that you would like to have a speciality engineer design a sheet pile wall as part of the contractors resposibility. we would spell out clearly that it is the contractors responsibility to include in their contract, require a licensed engineer from your state design the wall and submit sealed drawings and calculations and show on the drawings where you want the wall and what are the general conditions for it's use. we refer them to the geotecth report for parameters.
we just have it in our specs the sheeting and shoring of excavations is incidental to the cost for the excavation. the details are all means-and-methods.
if the sheeting is for a permanent wall, we would show the excavation line, the top of wall profile and the horizontal alignment and note the contractor should refer to the boring logs for available information on the soil conditions. if there are known utilities, we show them also. we also indicate they shall design in accordance with aashto and submit their design for review before ordering materials. the wall is bid per sf of exposed area, and is handled as a design-build item.
if the shoring is to be permenant, it should be designed by the engineer. if not the scope of work andrequired loadings should be very specific. the required code, such as aasgto should be specified. if the shheting is tempoary, it is the responsibilty of the contractor.it is a good idea to require to have the design done by a p.e. temporay sheeting work is not governed by any particular code, so no code should be specified.
the biggest problem with sheeting is no one ever pays attention to the geotechnical program for the sheeting. borings should be taken along the line of sheeting. if it is to be tied back, borings should also be done in the bonded zone of the anchorage. if cohesive soils are present, tubes should be pushed for samples. if the sheets will extend below the water table, accurate measurements should be made of the groundwater. sometimes this means waiting 24 hours for levels to stabilize. bori9ngs sahould extend at least 10 feet below the anticipated tip of the sheeting. stanard laboratory tests should be run on some samples back at the lab. if the excavation is below the water table, grain size for cohesionless soils will be important. unit weight and strength testing will be important for cohesive soils. this will probably cost $10,000 or so, which may seem like a lot, but a changed condition claim can easily be 10 times that amount.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
【转帖】decimal dimensioningfractional equivalents yang686526 American standards 0 2009-04-29 07:28 PM
【转帖】哪位高手指点一下下边lisp的怎么用 yang686526 数据库ObjectDBX 0 2009-04-28 12:13 PM
哪位高手指点一下下边lisp的怎么用 yang686526 ObjectARX(AutoLISP) 0 2009-04-26 06:19 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 07:39 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多