cold joint in a foundation wall?
i have a client that wants to place a cold joint in a foundation wall. it's a residential structure and the foundation is being constructed with icf's. the builder is worried about blow-out at the bottom of the forms as some of the walls are 11' tall. his concern seems legitimate, though i need to check the icf manufacture's spec. sheets to see if this is really a concern or not. the question still remains though about having a cold joint in the foundation. i've never heard of this before in a residential structure and can not find a suitable reference in the aci pertaining to cold joints.

the wall is reinforced for the lateral soil load with the rebar in the proverbial tension zone. in theory is seems like it should work as zero tension capacity is assumed for concrete anyway and the joint in the compression zone would be in compression, so that shouldn't matter either. i have some concerns about moisture infiltration, but i would really like to be able to cite a reference one way or another on whether or not a cold joint is allowed.
can anyone help?
not familiar with icf's, i.... concrete forms? the cold joint runs vertical or horizaontal? cold joint or construction joint, you want to have some sort of shear transfer. if the joint is horizontal, it is possible, not preferable, your rienforcing should have a full tensionlap or run continiuous. a vertical joint is easier to deal with. is a water proofing going to be applied to the exterior?
icf is "insulated concrete form" basically it's a reinforced styrofoam form that is left in place after the concrete is poured. the advantage being traditional wood forms are not required to be taken down once the wall is poured and the styrofoam, being on both the interior and exterior side of the walls, offers great insulation.
the joint would be horizontal and about half the wall height. the rebar is running both vertically and horizontally. the vertical rebar is designed to resist the lateral earth loads and is continuous from the footing to the top of the wall.
being these are concrete forms from a manufacturer, check with them, see if they have any literature, if he has inadequate restraint at the bottom, sure they could blow. sounds like he is questioning the integrity of the form.
pressure at the base of the form is going to be a function of time also.
is this wall reinforced? you could not have a horizontal joint without continuous reinforcing through it.
i don't find anything against a horizontal cold joint. you could equate it to masonry construction. your vertical rebar must be in the center of the wall so that it provides strength in both directions, so you would have to re-analyze the wall with this "d" in mind. shear would have to be considered, probably with some form of shear key. leaking would probably be your biggest concern. i would use those preformed rubber key joints that are often used at the joint between stem wall and footer and use a filter fabric system, such as mirafi hc drain, to reduce the hydrostatic pressure against the foundation wall.
another alternative would be to reinforce the insulated forms part way up with traditional forms that are removed after the concrete cures.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
buttress wall relative rigidity huangyhg 产品功能分析 0 2009-09-07 05:57 PM
brick fascia as part of code required foundation wall thickn huangyhg 产品功能分析 0 2009-09-07 04:49 PM
basement wall design huangyhg 产品功能分析 0 2009-09-07 02:35 PM
20 high basement wall and diaphragm huangyhg 产品功能分析 0 2009-09-07 08:23 AM


所有的时间均为北京时间。 现在的时间是 09:13 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多