默认 aws d1.4

aws d1.4
i've got #8 bars for a retaining wall, but, the dowels used 48" lap splice i called for on the plans are only sticking out of the footing 38" to 40". i can mechanically lap them at $50 a piece, or, i can weld per the above aws specification. i don't have this code, but, i'm willing to bet it's a full pentration weld that's required. anybody know? there is 100+ bars that need to be spliced. (can you say cha-ching?)
not that it's funny, but i went there on friday prior to the pour, talked with the guy doing the footing, and showed him the plans and told him it was imperative for the 48" length to be from the top of footing to the end of the dowel.
48 bar diameter lap splice?
what are the conditions? do you need to fully develop the bars?
more information, please?
12" masonry cantilevered retaining wall, 12' tall. same wall as
according to aws d1.4 rebar splise may be flare-v-groove weld, when you place rebars side by side. effective weld size e=0.6*r (r is radius of rebar). you may have weld on one side of rebar or on both sides. 125 percent of "fy" will give you required length of weld.
also you may use direct butt joint (v-groove or bevel-groove), or weld both bars to plate or angle.
i do not have the masonry requirements for lap splicing steel in front of me. for cip concrete, 40 bar diameters should develop the bar at the splice. review splice requirements, you may have enough to make your splice.
for concrete see aci 318, chapter 12.
could you increase the compressive strength of the cell fill concrete enough to effectively shorten necessary rebar development length to the 38" / 40" available?
hi chipb,
this may be a long shot, but retest your 2000 psi concrete. if it is significantly higher, recalculate to see if it will be adequate. good thing you have been inspecting!
if it's too late you will probably need to make an external remedial design to transfer the moment. it will be ugly.
regards
vod
hi chipb,
i believe the recent aci 318 has eliminated the need for 1.7 x development length for class c splices and reduced class c splices to class b. your situation should just work out!
hope this helps.
any comments on this change is welcome.
regards
vod
thanks vod & whymrg,
i had them order the mechanical laps yesterday. there is a preheating requirement for a615 steel that made welding substantially not economical!
fyi, yes, i still have a job (for now). i'm sure they aren't happy with me, but, i can find another job. my stamp on the other hand.....
hang in there, chipbfff">fff">. re
chip the preheating requirement is if the rod is damp or tepm are less than 50 deg f.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
aws d1.1d1.1m huangyhg 产品功能分析 0 2009-09-07 02:01 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 06:34 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多