默认 revision letters vs. numbers

revision letters vs. numbers
i cannot find standards documentation on pre-production vs. production revision labeling. does ansi standards state a lettering vs. numbering preference?
thank you, this website has been very helpful!
not that we have found.
the only thing we have found is if you use letters, you skip i,o,q,s,z since they could look like numbers. we are adapting an alpha revision scheme and ignoring the skipped letter preference; straigh a-z, aa-zz.
"wildfires are dangerous, hard to control, and economically catastrophic."
"fixed in the next release" should replace "product first" as the ptc slogan.
ben loosli
cad/cam system analyst
ingersoll-rand
the closest i find is asme y14.35m. but it does not list anything about numerical revs. at the past few companies i worked at, numerical was always used for pre-production (preliminary) then was released at revision a. we still do this now and is accepted by iso 2000.
chris
sr. mechanical designer, cad
solidworks 05 sp0.1 / pdmworks 05
per ipc (for the printed circuit industry) standard ipc-d-325a 3.8 for preliminary release:
method #1 - use +a, +b, +c, etc.
method #2 - use 1, 2, 3, etc...
steve smith, c.i.d.
product engineer
staco energy products co.
what does the "+" mean?
i have never seen that before.
chris
sr. mechanical designer, cad
solidworks 05 sp0.1 / pdmworks 05
it's the way they differentiate between preliminary (+a, +b, +c,...) and released (a, b, c,...).
steve smith, c.i.d.
product engineer
staco energy products co.
sorry to say, but that is very weird. it's a first.

chris
sr. mechanical designer, cad
solidworks 05 sp0.1 / pdmworks 05
the drm 10th edition states...production release drawings to have letter rev's a, b, c ...pre-release drawings will have rev's as x1, x2, x3...
swcadman
swcadman ,
we use the same x numbers for r and d work and a,b,c for the revs. though the skipped number reference i,o,q,s,z was unknown here...thanks looslib..
-mechantaeus
quote:
work hard and work smart
our records system will only accept number revisions. we have reserved revisions 80+ for r&d and 0-79 for production revisions.
don peckham
i just received an updated spec. x1, x2, etc are prelim/pre-prod/etc, - is for first released, alpha a,b,etc for production. this is industry standard and everyone should follow it.
chris
sr. mechanical designer, cad
solidworks 05 sp1.1 / pdmworks 05
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
rev letters huangyhg tec-ease(America) 0 2009-09-05 12:38 PM
【转帖】revision yang686526 American standards 0 2009-04-29 09:45 PM
【转帖】revision table order yang686526 American standards 0 2009-04-29 09:45 PM
【转帖】rev letters yang686526 American standards 0 2009-04-29 09:44 PM
【转帖】revision table part properties yang686526 SolidWorks二次开发 0 2009-04-13 01:58 PM


所有的时间均为北京时间。 现在的时间是 08:54 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多