默认 vertical construction joints 2 4-way wall corners

vertical construction joints @ 4-way wall corners.
hi i have a water tank partitioned into many smaller square cells like a checkerboard. i have seen t-shaped wall corner forms but what about cross-shaped? i have never seen those before. is it too hard to do.
the cells needs to be water tight such that water cannot get from one cell to the next and therefore require ribbed pvc waterstops in them.
anybody have suggestions on where to place these vertical construction joints?

my first thought would be to form & pour the corner "cross" monolithically, then put the pvc waterstop in each of the four vertical joints. each of the wall sections of the "cross" would be a full form width away. it makes bulkheading the end of the walls easiser.
if the process requires watertight cross walls, design them and let the contractor worry about forming them. he might have to build some custom formwork. but they're clever about these things and will figure it out.
as far as the spacing, i don't know how big your structure is, but 15 ft. from a corner is a good number. pour the cross sections last.
you might want to construct the checkerboard by joining together a bunch of '+' with the waterstop middle face of the tank walls.
i'd likely use a large bulbed pvc waterstop that fits on the form, not in the middle of the wall... had too much problem with these collapsing. you might also include a vulclay type of joint in the middle and terminate half the reinforcing or use proper dowels.
dik
bulbed pvc waterstop that fits on the form? what do you mean. do you mean place the waterstop flat against the form instead of at the middle of the wall cross section? that is possible?
if the walls are partitioned like a checkerboard, what about constructing the walls with volclay panels in between, as sandwiched between two concrete walls?
mike mccann
mccann engineering
yahoo,
yes, the type dik is talking about just sits flat on the form. if the forms are wood, you nail them on. some people call them "rearguard" waterstops, but in your case you should use them each side.
do you mean split flanged waterstops? the problem with these is that you can't splice it with perpendicular waterstops.
if all your waterstops are vertical, where would the perpendicular joints be? do you mean at the slab to wall joint at the bottom?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
foundation wall 40 feet below grade huangyhg 产品功能分析 0 2009-09-09 01:38 PM
cut horizontal bars at wall construction joints huangyhg 产品功能分析 0 2009-09-08 04:17 PM
cracks in new cmu basement wall huangyhg 产品功能分析 0 2009-09-08 02:27 PM
concrete tanks - vertical construction joints in walls huangyhg 产品功能分析 0 2009-09-08 12:55 PM


所有的时间均为北京时间。 现在的时间是 09:43 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多