默认 rs means estimate

rs means estimate
i provided an estimate based on rs means. client called me back that bidders wre way too high. do you have similar experiences?
the bids are what they are, the estimate is just an estimate. you can hire one of the bidders, you can't hire the rs means book.
i typically use means to get an idea, use the oh&p numbers for extra fluff, and then add a 10-25% contingency - depending on the client, the scope, and complexity. my numbers are typically higher than the bids but clients do not mind paying less.
don phillips
as stated in another thread - there are skills that can help an engineer in his job that are not specifically structural engineering.
estimating is one of these skills. i have had bids come in higher and lower. the thing i try to stress to the client is that i can provide an estimate, but a competitive bid will give you the going rate for the work to be done.
one thing to keep in mind in using means is that there are alot of "rules". it breaks things down to the part, but also gives some rough overall pricing. a person needs to make sure the numbers they are using includes everything. i would also verify some of the overall rough numbers with contractors to give yourself a better feel for where the numbers should be.
maybe this is a stupid question, but did you use the location factors in the back of the book? if you just used the raw prices and didn't adjust them for your location you could be way off, especially in the northeast or california. also important is inflation for large projects and compressed schedule.
just to further add to jedclampetts point:
means has difficulty capturing very localize phenomenon. for example, in my town, for a couple of years, masons and masonry contractors were in very short supply. they had more work than they could handle, and as a result, were able to charge prices far, far above what ms means would show for masonry installation. if you did any estimating involving masonry, you had to adjust for the local market conditions which were at least twice what rs means had.
the best source for such information is local general contractors who might owe you a favor or two.
thanks guys. probably structural engieenring looks very easy to me now as compared to cost estimating.
there are many things that can affect costs. as an engineer, you need to develop your skill at understanding and applying adjustments as needed to the means numbers.
just a list of a few things that i can think of:
bid environment
winter construction (temporary heat and protection)
size and quanity of various operations
site access
site with direct crane and material access or inside a factory a long way from a loading dock.
special owner's requirements
degree of difficulty (for instance: erecting steel over an operating machinery inside an existing factory or bringing steel up an elevator and erecting it inside an existing hospital.
these conditions can dramatically affect the cost and means is generally set up only for new buildings on a greenfield site.
demand and supply.
in australia, a separate profession, quantity surveyors, who are professional estimators, do the prebid estimates for buildings. structural engineers and architects exclude this from their work. the building services are usually still estimated by the engineers.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
residential material estimate 9takeoff0 huangyhg 产品功能分析 0 2009-09-15 06:17 PM
manhour estimate huangyhg 产品功能分析 0 2009-09-10 12:16 PM
construction cost estimate huangyhg 产品功能分析 0 2009-09-08 01:25 PM
ball park estimate huangyhg 产品功能分析 0 2009-09-07 02:13 PM
【转帖】ime Estimate For 1.07 Dwg Update Suppor yang686526 DirectDWG 0 2009-05-07 05:07 PM


所有的时间均为北京时间。 现在的时间是 10:27 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多