默认 repair to monolithic slab

repair to monolithic slab
a local contractor poured a monolithic slab radient heat slab over compacted sand(30 x 36)for a private garage. the problem is that the slab is 14" out of square,the building official issued a stop work order untill this is corrected .
the contractor obtained the services of a pe who dictated saw cutting across the slab than drilling holes embedding # 4 bar 10" ( 20db) deep at 1 foot on centers than reforming this new section to be poured -doing so would provide a even exposure along this line in question.
the contractor only drilled in 2 " so as not to damage the pex radient tubing.
another stop work order was issued
the pe has since stated that 2 " of imbeddment is sufficient.
anyone have any thoughts --- is 2 " sufficient?

check out our whitepaper library.
if a hilti adhesive, or equivalent, was specified as the epoxy bonding agent then they have tested values. 2" may not have a published value but the shear and any tension stresses that will occur are likely very small.
10" seems very deep to start with, which makes me think that an epoxy may not have been specified. is that the case?
first, i would nothing but an adhesive type material to bong the bars in the exiting (already placed slab).
second, without consulting any literature, my initial gut feel that 2 inch embedment does not sound enough (only my gut feel).
third, i also think that 10 inch embedment is excessive. i think 4 to 6 inches would be sufficient.
fourth, i would ask the engineer to substantiate the 2 inch embedment.
hilti hit hy 150 injection adhesive anchor:
1/2" rebar
min. embed (published values) = 2"
is this a structural slab? if it is just a nonstructural soil-supported slab-on-grade, then the reinforcing is just for crack control. the building official may be overstepping their bounds by issuing stop work orders.
while slab is supported by compacted soil, at least one would assume that is the case; aci requires minimum reinforcement for shrinkage. the way to get around that is to construct the slab in concrete panels with dimensions that will minimize cracking. with panelized construction one must provide a good detail for the construction and control joints.
regards
the bar was not apoxied, thanks forthe information on hilti , i will contact the engineer to substantiate the 2 " embedment
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pt slab design - something called drop bands or slab bands huangyhg 产品功能分析 0 2009-09-15 03:17 PM
post-tensioned beams parallel to slab huangyhg 产品功能分析 0 2009-09-15 01:51 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
hairline cracks in post tensioned slab huangyhg 产品功能分析 0 2009-09-09 03:43 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM


所有的时间均为北京时间。 现在的时间是 04:45 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多