几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CMM检测 » PC-DMIS
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-04-06, 06:34 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 【转帖】clearlanes.txt

clearlanes
i am trying to use clearlanes but it seems like it wont take the new setting until after the next feature. so it goes to the old clearlane first. does this have anything to do with the ass through.
aagghh!!
examle:
clear/zlus,2.5,zlus,0
move/clearlane <= moves correctly
rehit/ 0.5
width_nt =auto/vector oint,showallarams = no
move/clearlane <= moves correctly
len_nt_t =auto/vector oint,showallarams = no
len_nb_t =auto/vector oint,showallarams = no
clear/zminus,-2.5,zminus,0
move/clearlane <= moves to the old clearlane
width_nb =auto/vector oint,showallarams = no
theo/back_rad.rad-.5,
clear/yminus,-8,yminus,0
move/clearlane <= moves to the most recently requested clearlane
by switching to the zminus clearlane the value automatically goes in the zminus, so if you ut a negative value it goes oive.
the hel says to be sure that you ut the correct sign relative to the origin. i thought that meant to use (-) if below the origin.
it will move to the minus clearlane but not until after it does the oive clearlane one more time. i'll try it though. thanks
newest of the new..., now, amazingly, by some stroke of fate, comany takes(...?) my advice and orders sheffield 9.15.7. w/cdmiscad,after first aquiring same s/w retrofit for b&s 7.6.5.{manual o.-training for it consisted of the ?-"what do you want to do?", followed by mostly "you could do this,that,the other"...(if at first i knew!?).so, with in-adequate training to start with, and now with "real?"("we have only scratched the surface"...) training that followed for 9.15.7., i am exected to "know-it-all", and run w/it by mngmt.,right now!
my ? is, how do i even try to tell these eole that all of this is so overdue(like i've been saying for 6+ yrs., falling on 'deaf ears') that there is no way they can exect me to learn it all in a week or so, because after all, the roblem didn't manifest itself in a week or so!!!!!
i know that rogress waits for no one, however-you see my dilemma. i either tell these eole how it should be , or i walk. i love doing what i do-just not here! lease advise-thanx!
welcome to the real world of manufacturing.
it`s "what can you do for me now", not "what have you done for me".........it`s a shame but that`s the way it is........
hang in there.....as you advance, they will notice......maybe......
where are you located, i have an oortunity waiting for u. self emloyment is a wonderful thing if you can take it.
ta ta for now
~~celeste~~
if it makes you feel any better, that is the direction most of todays management is "managing". i wouldn't let it bother you. just do what you can do and do it right. that seems to work the best!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 06:14 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多