默认 post tension garage layou

post tension garage layout
i am laying out a pt one story garage. the garage is 180 feet wide. i was going to use a beam/slab system. run the beams for three spans (60' each). what is a good spacing for the other direction? i was considering either 18' or 27' but thought the 27' was too far. also is a beam 180' long to long to pt? will there be too much shortening?
span the slab three parking spaces--typically 27-30'. not too long for shortening they will stress both ends. sounds expensive what about a precast garage.
what load goes on the slab/beam? is it cars or roof loads? as mentioned, precast pretensioned double tees span 65 feet for garages as a standard width for two rows of 90 degree parking and an aisle.
the garage is a one story with parking on top. i am concerned about the 180 foot length of beam and the associated shorting. i know the owner wants to span the slab 27 feet but i was going to shorten it to 18' to keep load off the beam and hence less pt and hence less shortening. do you consider the beam to column connection pinned?
is this your first pt project. can be a complicated system if you aren't familiar with it. is there someone at your office that has experience with the system. unless there is some type of height restriction which would limit the beam depth the slab would span at least 3 spaces--some people may go 4 spaces but i think 3 spaces is typical. don't worry about the shortening--they can stress the cables from both ends. i have designed condo slabs as far apart as 200-250'.
actually this is a sister garage to one i did last year. i felt there was significant shortening and i am trying to advoid it on this one. the garage last year was the first pt i did and no there is no one in the office to ask. i did not find it difficult to design and it came out well but i was a bit shocked to see how much it shortened. the exterior columns were visibly out of plumb. i used adapt pt which is pretty straight forward and i have designed concrete structures before just not pt.
how much did it move--1/4" or something. as long as it doesn't damage anything it won't matter.
i attended a pt seminar recently and they stated that you can expect 3/4" per 100 foot of beam so i guess you can expect 1.4" but it looked more then that in fact it looked like 1.4" per side. what about beam to column modeling? pinned or fixed? lateral system is shear wall.
beam to column is whatever it is. if poured together (which it probably is)it is fixed. it will generally shorten with the shearwalls at the zero point. would try to not place the shearwalls at the ends of the 180'. if so then the shortening could be a problem. generally would place shearwall in that direction (can probably use moment frame for this condition--don't have seismic considerations where i am so don't know if that is a factor)near the center so about 90' of shortening which sertainly is not a problem.
i design mostly flat slabs. on these projects the forming contractor will often place the tops of the columns outward and let the pt pull them back in.
i agree that the column spacings should allow at least 3 parking spaces between, preferably 4. i don't consider 2 spaces between columns a workable design. in parking decks i have done, either conventionally reinforced or posttensioned, the wide, flat band beams span in this direction, with the slabs spanning in the other direction (across the driveways).
60 feet is normally an unnecessarily long beam span in posttensioned construction, and not very economical.
as to shortening, as much as 60 to 70% of your shortening will be from concrete shrinkage which will occur whether or not you tension the deck. posttensioned decks are not the only ones with restraint cracking problems.

mauleflyer,
did you go to the asce seminar taught by bijan aalami? the 3/4" per 100' shortening is due to concrete shrinkage, not shortening due to pt. for those not familiar with that name, he owns the adapt company and has been very important in the pt industry. one thing bijan said to do in modeling is pin the far ends of the exterior columns.fff"> all other connections should be fixed. this will allow the beams to shrink and not induce additional moments into the columns.
what is a good spacing for the other direction? i was considering either 18' or 27' but thought the 27' was too far. [b]it all depends on your slab depth. at 27' you would be looking at a 7"-8.5". seems resonable to me which will allow you to have top and bottom steel.
also is a beam 180' long to long to pt? will there be too much shortening? [b]no. you can easily stress a 180' pt beam from each end.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
multi span cable huangyhg 产品功能分析 0 2009-09-10 03:25 PM
encapsulated post tension anchorages huangyhg 产品功能分析 0 2009-09-08 10:16 PM
elongation of post tension cables huangyhg 产品功能分析 0 2009-09-08 10:07 PM
deck-railing post connection huangyhg 产品功能分析 0 2009-09-08 04:37 PM
axial tension in a post-tensioned member huangyhg 产品功能分析 0 2009-09-07 02:06 PM


所有的时间均为北京时间。 现在的时间是 09:56 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多