默认 one lane vehicular tunnel under existing railroad tracks

one lane vehicular tunnel under existing railroad tracks
anyone have example projects and/or design guide references or suggested methods of construction? it is through sandy clay type of material. the railroad has to be functional during construction of tunnel.
check out our whitepaper library.
jack casing, micro tunneling. what does the rr have o say abou methods
richard a. cornelius, p.e.
the rr has no jurisdiction in this case.
- construct a shoefly
- re-route the railroad to the shoefly
- construct the underpass using open cut method
- re-route back to railroad mainline
can't move the railroad. we have to do it with rr operational.
does the rr operate 24/7 ? is there some time when you could dig under the rr without a train going over it ?
no, it operates 24/7 for the delivery of coal.
good luck
you will have to tunnel as suggested earlier by dick. your best bet is to call in a boring contractor and discuss methods and issues with him to get a better feel. some of the issues that you need to start defining are:
1) allowable settlement of the tracks and monitoring requirements for it
2) action plan if the tracks do subside
3) how deep to groundwater?
4) type of tunnel to construct ie: concrete box, steel arch, shotcrete lined, other?
5) if you are in expansive clay, will your subgrade expand once you remove the load? if so, how will you mitigate the effect on the railroad above?
6) will grouting be require to stabilize the ground before tunneling? will grouting be required to fill voids behind the lining?
7) can you jack a culvert through the embankment instead of constructing a tunnel?
very good points cvq. thanks. the tracks can not be allowed to settle. groundwater not a problem. choice of tunnel type is wide open. no expansive clay. jacking a culvert may be possible if equipment is readily available. location is south america.
what will be using this tunnel? would it be cheaper to build a bridge?
richard a. cornelius, p.e.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
new to existing concrete beam connection huangyhg 产品功能分析 0 2009-09-10 04:22 PM
increasing anchor embedment depth in an existing slab huangyhg 产品功能分析 0 2009-09-09 07:25 PM
coverplating existing columns huangyhg 产品功能分析 0 2009-09-08 02:16 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM
【转帖】rendering On Existing Mfc Device Conte yang686526 DirectDWG 0 2009-05-07 02:57 PM


所有的时间均为北京时间。 现在的时间是 06:30 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多