几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 02:59 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 moment of inertia for built-up beams

moment of inertia for built-up beams
question:
if i have an i-beam and a c-channel stacked and welded as one, to find the "i" of the "built-up" member can i just add the two "i" values together, or is there some other method of finding the combined "i."
thanks
steve mackie, product/applications engineer
apical conveyor systems, inc.
tavistock, ontario

see
this can be found in many text or exam review manuals.
one more thing, c channel should be oriented horizontally, thus use the i value for the weak axis. iy.
also, isnt there a table of section properties for i beam and a challel in the aisc steel manual? unless it is a bizarre combination, you should be able to find the values you need from the steel manual.
thanks guys, i don't have an aisc steel manual, i have a few books from lincoln and my text books, but never really did that much structure so i just needed a little quick refresher and fast. there are a lot of smart people here that re
packie,
your question about structures (acutally its about section properties - aka deformable bodies) makes me wonder what you are using this built up seciton for? finding the capacity of an i section with an attached channel is more than just finding the i. could you tell us what this is used for? thanks
sure, the channel is a track for a roller to run in, and it is sitting on top of the i-beam. the s6x17.25 is in the usual position and the 7x12.25 channel is in the "i" position on top. there are two of these parallel about 48" apart and the wheels of a horizontal scrap conveyor run inside the channel.
steve mackie, product/applications engineer
apical conveyor systems, inc.
tavistock, ontario
hi packie81,
you don't mention how the channel is attached to the i beam. horizontal shear connectors at intervals are required to utilize the composite section for bending.
regards
vod
my mistake, you mentioned it is welded as one.
vod
voyageofdiscovery, i think your point is very well made. two pieces being welded as one, i am guessing, is a continuous fillet welds along each side. my question is: is that necessary?
only connection you need is to be able to resist the amount of shear flow between the two pieces so they act compositely. like voyageofdiscovery sugggested, intermittent welds or even bolting at certain spacing may suffice.
hrm, i find some of these answers going much deeper than i expected.
whyun: no, we wouldn't do a continuous weld over the 40', probably wouldn't be much more than a 1-12 1/4" fillet.
steve mackie, product/applications engineer
apical conveyor systems, inc.
tavistock, ontario
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
first moment of inertia huangyhg 产品功能分析 0 2009-09-09 12:07 PM
effective moment of inertia - precast stairwell huangyhg 产品功能分析 0 2009-09-08 09:42 PM
concrete edge beams huangyhg 产品功能分析 0 2009-09-08 12:02 PM
beams shear splices vs. moment splices huangyhg 产品功能分析 0 2009-09-07 03:13 PM
beams braced with a welded flat steel plate huangyhg 产品功能分析 0 2009-09-07 03:12 PM


所有的时间均为北京时间。 现在的时间是 11:01 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多