默认 hole in retaining wall

hole in retaining wall
an egress well was installed in the wrong place in a foundation and now the architect wants to have it moved to where it should be. all the walls are all ready poured with #4 rebar running the length of the walls (horizontal) at about 3' o.c. (my guess - can be verified).
the architect wants to simply cut a hole in the wall and rebar to place another egress window in the correct place.
is this even possible? is there anyway to reinforce this hole post-pour?
check out our whitepaper library.
where there's a will, there's a way.
while it may seem dumb at first, if the existing hole can't be salvaged for reasons of aligning with equipment or some other facility it was meant to provide acess to, an alternate can be accomplished.
the new hole can be oversized to expose the reinforcing that will need to be lapped or mechanically coupled while the necessary reinforcing is cut to provide for the hole. the additional bars that normally accompany holes can be placed. once the sill has been place and the forms set, the entire area can then be re-poured.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
you could add pilasters or stiffening ribs on each side of the door as maybe necessary.
if the bars are 34 @3ft c.c. then it is not heavily reinforced. generally new bars can be drilled in and grouted to the the existing wall and the opening reinforced. the grouted dowels would transfer load via shear w/some tension capacity depending on installation. the opening is then reinforced and formed. a slightly wider opening, sometimes refered to as a birds mouth is left at the top. the concrete is poured to the top of the birds mouth. while the concrete is still green, the birds mouth form is striped away and the birds mouth is ground flush. an alternate method is to drill two holes in the top to the area to be poured. grout is pumped in one hole until it returns out of the other. note that if the wall will be exposed, the patch will be evident. to make the best possible mathch, be sure the supplier uses the same cement as in the original pour.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
foundation wall 40 feet below grade huangyhg 产品功能分析 0 2009-09-09 01:38 PM
design of retaining wall huangyhg 产品功能分析 0 2009-09-08 05:48 PM
concrete basement wall design huangyhg 产品功能分析 0 2009-09-08 11:39 AM
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
【转帖】asme - where to star yang686526 American standards 0 2009-04-29 07:28 PM


所有的时间均为北京时间。 现在的时间是 11:56 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多