几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 04:31 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 hillside crawl space excavation questions

hillside crawl space excavation questions
issue: 1960s or 70s era, single story (with loft) home on sloped lot in marin county, ca. homeowner needs more space and wants to excavate part of sloped (max 1:2, avg 1:3)crawlspace. no evidence of hillside instability- floors are level, doors and windows open fine, just one minor diagonal crack in one footing wall (appears to be old settlement crack.) concrete appears sound. footprint is 40 feet wide and 24 feet deep (into the hill.)
solution: excavate the front 2/3 of crawlspace area and provide retaining wall, which will step back at about midway but still be held off the back wall by at least 5' to avoid undermining of the back footing. might have to underpin a small length of the (e) side wall footings at the ends of the retaining walls depending on what we find during excavation. wait 14 days to backfill.
cap front (downhill) stem wall to raise height by 1'-8" max to be in line with finish slab. cut/fill where needed and pour slab. provide #4 @ 18" in new concrete, epoxy embed into (e) stem wall 24". roughen (e) surface and use a bonding agent. do not tie new slab into new capped wall.
anyone see anything of concern here? the owner is concerned about the added weight from the cap and the added fill/slab, though i assure him that weight is nominal in terms of what footings are designed to carry, and considering the soil being removed, and that adding the cap is in no way detrimental to the integrity of the foundation or the house. i just want to be sure i'm not completely missing something here... thank you for any comments.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
digging out crawl space under existing house huangyhg 产品功能分析 0 2009-09-08 06:47 PM
crawl space ventilation huangyhg 产品功能分析 0 2009-09-08 03:50 PM
【转帖】query regarding printing drawings 9dwg0 in model space yang686526 DirectDWG 0 2009-05-07 12:06 PM
【转帖】paper model space yang686526 DirectDWG 0 2009-05-06 09:37 PM
【转帖】how to transform a point in sketch space to assembly space yang686526 SolidWorks二次开发 0 2009-04-13 12:04 PM


所有的时间均为北京时间。 现在的时间是 07:04 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多