默认 erection of cable bracing

erection of cable bracing
hello all,
does anyone have any idea what the requirements are for the tensioning of cable braces in the walls and roofs of a metal building? intuitively, i know that the cables need to the taut so that they are immediately engaged when loaded, but i can't find a specification that seems to address this. i have looked in the mbma and in the ubc to no avail.
any help would be appreciated.
thanks in advance,
js.
check out our whitepaper library.
tia/eia standard which is the structural standards for steel antenna towers and antenna supporting structures recommends that guy cables be tensioned to 10% of their published breaking strength with upper and lower limits of 15 and 8 percent respectively. (reference section 10.2).
this might be a start.
also note that the tension force in a tension only brace is reduced when the force is compresive. it is usual to provide sufficient tension so that the brace does not go slack under normal loading conditions but only under the extreme design loads.
i would think the only requirement would be to to maintain tension prior to any lateral movement. ie, design so that when compression loads are applied to the structure, the cable still has tension in it. that way, it doesn't have to move to take up any slack.
aisc's steel design guide series #10, "erection bracing of low-rise structural steel buildings", provides some guidance that you can use. see page 29 for max. drape (per caltrans falsework manual) and then eq 5-4 for how to calculate the cable preload value.
advice from j19 sounds good to me. here is a link to the caltrans falsework manual (free .pdf download). take a look at the pages beginning on 4-40.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
deflection in cable huangyhg 产品功能分析 0 2009-09-08 04:53 PM
continuous steel cable vs. segmented huangyhg 产品功能分析 0 2009-09-08 01:39 PM
construction bracing steel structures during erection huangyhg 产品功能分析 0 2009-09-08 01:24 PM
bracing in a freezer building huangyhg 产品功能分析 0 2009-09-07 04:43 PM
bottom chord bracing for cold form trusses huangyhg 产品功能分析 0 2009-09-07 04:28 PM


所有的时间均为北京时间。 现在的时间是 04:45 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多