几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 05:24 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 design literature on hip roofs

design literature on hip roofs
can someone point me to where i can find design techniques for wood framed hip roofs? i refer to hip roofs that have no ceiling joists or cross ties, providing a cathedral type of look.
i'm sure the hips will produce a thrust at the lower support corners. but i'm unsure to what happens to the reactions from the hip at the top of the ridge.
also if there's a continuous ridge, can the rafters at either side be designed as a 3 hinged arch? of course, this will also exert thrusts on the tie beam below.
any suggestions on finding calculated examples will be welcomed.
find a job or post a job opening
on my previous job i specified bent steel beam (not really bent, just welded in an angle).
never, but never question engineer's judgement
this project is an old residence (1956) with a hand framed hip roof. problem is the new owner wanted a cathedral look and during remodeling the contractor saw no problem in removing all the ceiling joists (that basically act as tension ties)and gave the owner what he wanted. i had done the structural engineering for a 2-story addition. of course, during a site visit i saw what had been done and almost had a cow.but the contractor (not an engineer) keeps reassuring the owner that i'm exaggerating and is not a big deal...any thoughts?
i think the contractor and owner are both morons, and they may well come to that realisation in the next big wind storm or snow storm.
the thrust has to be resolved by some means. just follow the load path.
dgpe....if the walls can't handle the thrust, you will have to have collar ties/beams. if i can dig one up, i have photos of a similar failure...this one due to excess collar tie spacing and no ceiling joists.
before jump into conclusion, i suggest to look into this matter from another angle. if you are asked by the client to come up a solution to make the existing roof the cathedral type, what would you do? i think you will be glad to take on this challenge rather than an outright answer "no".
once you have came up your own solution, then you can back check, and point out the problems with the non-engineered works with confidence. two specific areas i would look into - the roof geometry and
i have a pretty good idea of how to design it (if from scratch). but on an existing roof, how can you handle the reaction from the hip rafter at the top of the ridge without ripping whats remaining of the roof to take care of this load? other than that, it's a matter of detailing the proper connections between
i'm not sure how the removal of the ceiling joists has affected the hip to ridge connection. wouldn't that connection have always been subject to thrust from the hip?
"it's a matter of detailing the proper connections between members and using the proper connector to transfer the thrust ..."
i think that's the key. in a beam-column (rigid bent), as long as the joint is capable of handling the moment carried over by the
the concept works well for a simple rectangular hip structure, but can get real complicated real fast when the rectangularity is lost, as is with most architectural designs.
mike mccann
mmc engineering
if there is a really bad problem, you will be able to see it almost immediately in the walls. put a level on the walls to see if they are still plumb. i have seen this many times when people try to add a loft even on a gable roof.
a gable roof can be a little more forgiving because the ridge can act [somewhat] as a beam. but with a hip roof, you should be able to see movement at the top of the walls pretty quickly - especially near the center of the wide portion of the house.
i agree with hokie that both the contractor and the owner are morons if they don't think there is a huge potential for a problem.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
contract issues - structural steel connection design in the huangyhg 产品功能分析 0 2009-09-08 01:40 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
【转帖】decimal dimensioningfractional equivalents yang686526 American standards 0 2009-04-29 07:28 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 06:17 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多