几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 09:31 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cmu filled opening in existing concrete wall

cmu filled opening in existing concrete wall
i am filling an opening (26' wide x 16' high) in an existing 12" solid concrete wall (not tilt-up) with 12" cmu in a running bond pattern. the opening is currently installed with a folding (4 leaf) metal door that operates much like a closet bifold door. the metal door is a corrosion headache and leaks energy and water.
the new cmu partition will have in the middle a 16' high overhead roll-up door which i will anchor to the existing heavily reinforced concrete lintel/header of the opening. i am also installing a personnel door to one side about 3' away.
my quandry is that i wish to properly fill and reinforce the cells next to the overhead door, and i am uncertain whether i am required to "tie in" the top course with the existing lintel.
this is an issue of constructability, and i am uncertain about current techniques for pumping concrete horizontally to achieve a good bond beam.
i'd like to hear if anyone has tackled a similar issue and how it was solved.
thanks
jmm
take the new wall as high as you can and still be able to grout cells and horizontal runs. dry pack grout the rest. are you designing the wall to span horizontal or vertical?
the wall should tie-in to the existing to help eliminate cracking that will occur. you can never really be free of cracking but it can be better or worse. if you need the existing lintel to support the top of the wall for lateral loads, of course you'll have to tie to the existing. also, tieing to the existing will help with any differential movement of the new relative to the old.
to pump like that, you'll have to have holes knocked in the lintel block of the bond beam and use grout with a high slump. when you hit the top you have to dry pack or use a stiffer grout to plug the hole and finish what you need to do. it's not impossible but it won't be pretty. usually you'll have a rebar epoxied into the existing bond beam and the existing jamb to help tie the new to the old.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
buttress wall relative rigidity huangyhg 产品功能分析 0 2009-09-07 05:57 PM
bolting bracket to concrete wall huangyhg 产品功能分析 0 2009-09-07 04:15 PM
adequacy of existing masonry bearing wall for residential ad huangyhg 产品功能分析 0 2009-09-07 10:15 AM


所有的时间均为北京时间。 现在的时间是 09:49 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多