几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 04:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 boring under existing piping

boring under existing piping
i need some suggestions............
i've got an existing refinery that some very old and very wide below grade pipe trenches.
i've got to route some new utility (power) under them (+/- 3'-0" below bottom of trench) in most areas, directional drilling will work.
in one area, i have no outlet access for directional drilling, so it looks like we're stuck hand digging (about 80', 3'-0"deep) around a very congested pipe area.
any experience with trenching equipment that can be pushed through wet mud/sand that deep and that long?
thanks in advance.
jjf
i would consider injecting epoxy grout before excavating and then perform your digging carefully. the epoxy will hold "gel" the soil and allows for excavation without undermining the existing footing or trench. i have used this successfully in the past.
here is one of such product supplier prime resin
good luck.
lutfi
lufti,
thanks for the suggestion. i had seen some "ground freezing" where a cement grout was injected to fix shifting soils for removal.
just didn't occur to me for this one.
jjf
can you put down a pit and jack a casing through? how large is the conduit? can you access both sides of the trench?
sometimes bentonite slurry method is used for excvating almost vertical but this method is very specific to site and requires experience.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
blasting bedrock next to existing structure huangyhg 产品功能分析 0 2009-09-07 03:55 PM
bearing capacitypressure of existing asphal huangyhg 产品功能分析 0 2009-09-07 03:15 PM
adding studs to existing composite beam huangyhg 产品功能分析 0 2009-09-07 10:13 AM
【转帖】asmeb107.100-2002-b94.9-1999标准 huangyhg American standards 1 2009-09-01 09:28 AM
【转帖】rendering On Existing Mfc Device Conte yang686526 DirectDWG 0 2009-05-07 02:57 PM


所有的时间均为北京时间。 现在的时间是 01:42 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多