几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 07:22 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 weak columnstrong beam

weak column/strong beam
as a continuation of an archived thread (
as the originator of that thread, i feel your pain. i can't recall all of the research that we did for that project, but we ultimately ended up using dog bone moment connections. i seem to remember that it was very difficult to make my siuation work using the other types of moment connections. i also seem to re
i did receive a response from aisc. here it is:
"the idea behind the moment frames found in the aisc seismic provisions (i.e. smf, imf and omf) is to establish a design where we achieve strong columns/weak beams. otherwise, a localized failure in a column can result in a global collapse scenario for floors above the localized failure. hence all smf and imf prequalified moment connections are based on strong column/weak beam testing.
please note that omf does not require the use of prequalified moment connections. that is, any moment connection, even those for static loads (i.e. those found in the aisc manual) may be used.
hence one can conceivably design a single-story omf with weak columns/strong beams and avoid the multi-story collapse scenario.
in such a case, the plastic hinges would form at the tops of the columns rather than in the beams. one would need to consider the column anchorage rigidity when attempting to determine when a plastic hinge will form at the top of the column, as the number of hinges in the frame will defined when the frame mechanism will develop and hence when collapse will occur. that is, one cannot treat the column anchorage as a hinge (pinned connection) or as a fixed (moment connection) unless it has been designed that way, which is critically important, as it affects the load which will develop a plastic hinge in the column top (i.e. column anchorage affects the moment diagram of the column.)
however, omf have requirements for continuity plates within the column, as again, the seismic provisions address moment frames from a strong column/weak beam perspective. having said that, you would need a building official to approve the design you mentioned as an omf."
my problem is i cannot use omf because of the seismic design category. yet my member sizes are controlled by wind drift. in aisc 341, the column-beam moment ratio does not apply to imfs, only smfs (sections 9.6 & 10.6). this seems to be the step that would ensure strong column/weak beam - is this correct?. if this step is not required for imfs, does that mean the strong column/weak beam requirement does not apply. in using the design procedure in aisc 358 for rbs connections, i don't find a step that checks the column capacity. i don't want to have to use w10x100 columns for a one-story building. any thoughts or comments on aisc's reply.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
question regarding floor support beam installation huangyhg 产品功能分析 0 2009-09-15 03:58 PM
help with composite beam huangyhg 产品功能分析 0 2009-09-09 04:15 PM
cross beam bolted connection huangyhg 产品功能分析 0 2009-09-08 03:55 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 12:14 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多