几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 04:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 ying new foundation to existing foundation

tying new foundation to existing foundation
what are your thoughts about tying a new building foundation wall to an existing foundation wall if the new building's superstructure is designed so it could stand alone if the existing building were to fall down? do you recommend doweling or not? does doweling help settlement issues?

if it is a small, light addition, i would definitely dowel it together with the existing and calculate the new footing working together with the existing.
if it is a larger, heavier addition with say column loads in excess of 75 to 100k, i would try to make it independent.
not knowing the specifics of your case, but in general, if i am adding an addition on to an existing building, i try and dowel the footings together to prevent differential settlement between the existing part and the new part.
( i am assuming spread or strip footings here, not a pile system)
most of the expected settlement for the existing part will have already occured if it has been there any significant period of time. the new section will still undergo its settlement. this could lead to differential movement between them with could throw off brick lines, precast revels, etc that could be considered objectionalbe from an appearance point of view.
usally, i use rebar drilled and epoxied into the old footings.
keep in mind that in ibc chapter 34, if you increase the load in any element more than 5% then you have to check that element and bring it up to the new code if it isn't adequate.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
foundation cracking and settling huangyhg 产品功能分析 0 2009-09-09 01:24 PM
footing missing under an existing foundation huangyhg 产品功能分析 0 2009-09-09 01:04 PM
doweling into existing foundation huangyhg 产品功能分析 0 2009-09-08 07:29 PM
coverplating existing columns huangyhg 产品功能分析 0 2009-09-08 02:16 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM


所有的时间均为北京时间。 现在的时间是 05:37 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多