几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 03:37 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 ransverse stability of long span truss

transverse stability of long span truss
hi
there is a curved steel truss of 50m span with two steel columns on each side. transversely, this truss is spaced at 8m for 120m long. may i know how do i check the lateral stability of this long span truss in 120m direction although there are purlins on top of truss and cross bracing at end bay? normally at both end bays, there are steel columns placed below the truss, do these columns help in lateral stability of the truss ?
the lateral bracing of the trusses can be provided by the purlins provided that they are designed to do so. the purlins can then carry the loads back to the cross bracing which can then be designed to transfer the load down to the foundations.
the columns at the end of the structure are usually designed to carry vertical loads and only the wind load in the horizontal direction. structurally, it would be inefficient to design these columns to carry the lateral load when you have diagonal bracing which can do the job using much less steel and can do it with less deflection to the structure.
thinking practically, on a 50m span one should expect the purlins to be spaced at approx 1-2m c/c along the top chord. this would give between 30 and 40 or so purlins along the length. even on such a large building, the axial load on each purlin due to the wind load on will be reasonably small. it is reasonable to assume full restraint due to the cladding, therefore, the purlins should be checked mainly for bending with the nominal axial load due to wind. bear in mind, of course, one would also expect the bottom chord of the truss to be restrained by bracing as well, therefore the wind load will also be shared with these elements.
will p-delta analysis with a small lateral load applide do anything??
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
siccors truss connection huangyhg 产品功能分析 0 2009-09-15 10:35 PM
questions regarding 121 span girder truss huangyhg 产品功能分析 0 2009-09-15 04:01 PM
permanent truss bracing huangyhg 产品功能分析 0 2009-09-15 12:11 PM
lateral wind loads - residential construction huangyhg 产品功能分析 0 2009-09-10 09:57 AM
【转帖】memory leak issue yang686526 DirectDWG 0 2009-05-06 05:37 PM


所有的时间均为北京时间。 现在的时间是 09:55 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多