几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 10:56 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 single pile cap

single pile cap
when i have a single pile cap for a column. is there any parameter or rule of thumb considering the depth of the pilecap and the amount of reinforcement required???
if you analize it theres no punching shear on the pile cap, and there is no moment applied to it, except if there is an eccentricity applied to the pile cap by the column or by misplacement of the pile.

in my experience with the aashto code the minimum depth is the column diameter or smallest column dimension but not less than 30 inches. also, hairpin bars are placed from one pile to the next in each direction. generally, the bars are #6 (5/8").
i'm sure that various building codes allow for less depth but i can't recall the numbers offhand.
thanks for your reply qshake. i have seen that on the bottom of the single pile cap you use a minimum reinforcemnt ratio, i think is 0.0018 just like a footing. you use this reinforcement both ways on the bottom of the pilecap.
the pile cap is in pure compression and i think this bottom reinforcement is just to prevent mittigate any tension stresses that might affect the pile cap. but if the pile cap is un pure compression, does the concrete f'c has to be checked to i think.
minimum depth according to reynolds is as follows:
if pile dia. < 550mm, d= {(2 x dia.) + 100 }
if pile dia. > 550mm, d= 1/3 {( 8 x dia ) -600 }
but must be sufficient to meet anchorage - bond lengths of starter bars and both normal and punching shear requirements.
eccentricity in column will create moment in the pile cap.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast pile connection to pile cap huangyhg 产品功能分析 0 2009-09-15 02:22 PM
precast concerete pile cap and embedded plate huangyhg 产品功能分析 0 2009-09-15 02:13 PM
pile cap huangyhg 产品功能分析 0 2009-09-15 12:22 PM
h pile huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM


所有的时间均为北京时间。 现在的时间是 01:02 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多