几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 06:50 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 review of shop drawings

review of shop drawings
why and why not?
should a third party, registered engineer, (other than the engineer of record) review the shop drawings and provide the entire construction administration phase for a 25000 sf two-story wharehouse?
why and why not? please state reasons and backup your position on this issue.
thanks
v2
check out our whitepaper library.
most u.s. building codes require at least some site visits by the engineer of record.
also, the true purpose of requiring shop drawings are twofold:
1. forces the contractor to develop exact plans of the individual pieces and the erection of your structural elements. this aids the fabricators and streamlines the fabrication process. it also makes the contractor really "get into" the project and in the process, many issues of construction, means & methods, and scheduling appear, helping the contractor to do the job better.
2. allows the engineer of record one method of determining if the contractor is correctly interpreting the design plans. your plans and specs are a communication tool, and the shop drawing reviews permit a check on whether you are adequately communicating.
a third party reviewer can satisfy item 2 above if that reviewer does indeed understand your plans. but there are always subtleties in any design and the engineer of record can do it best.
this same item (2 above) is achieved by the on-site observations. you look for general conformance to your design plans....not to check/inspect every little piece of work for conformance....but to verify that the contractor can indeed properly interpret your plans.
in other words, if they get a sequence of rebar placed properly in one place, they therefore have the ability to properly get it right in all the other places of similar condition.
so a third party reviewer or on-site observer must be able to interpret your plans to do this job right. how do you know that they can do this?
jae,
i have no way of knowing if he can do it right. the question now is:
am i liable as the engineer of record for his errors?
the client does not want to pay for construction administration. therefore, i waved my responsibilities to administer the construction process. moreover, i will never hear from anyone about the progress of work or after. in other words, i am out of the loop permanently. in addition, i do not know who will be handling the construction administration phase.
thanks
v2
we get a number of projects where this happens..usually in the federal gov't agencies.
what you could do is call the owner and suggest that at least you provide some periodic observations to see if the work generally conforms to your plans. if you are under the ibc or ubc, you could point to the chapter 17 paragraphs that indicate the requirements for structural observations.
if they refuse, then simply document your telephone conversation, including your offer of services, and put it in your project file.
some may suggest that by showing up on the site you take on added liability...but i'd rather be able to be on the project to ensure the success of my design as much as possible. you can be sued regardless of whether you set foot on the site or not.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
fees for shop drawings huangyhg 产品功能分析 0 2009-09-09 11:27 AM
engineered shop drawings huangyhg 产品功能分析 0 2009-09-08 10:28 PM
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
copied cds as shop drawings huangyhg 产品功能分析 0 2009-09-08 01:56 PM
certification of shop drawings huangyhg 产品功能分析 0 2009-09-07 11:16 PM


所有的时间均为北京时间。 现在的时间是 02:52 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多