默认 re-levelling a building

re-levelling a building
i am working with a client who has experienced settlements of their building of up to 8"-12". as such, we will be looking to re-level the building by jacking the settled corner back to its original position. the small, wood framed hotel, generates revenue in the summer, during which time the jacking work would be occurring. would the hotel need to be closed as the building is being leveled?
work such as this can generate a lot of noise which can be troublesome to weary travelers. big problem for the reputation here.
won't the "homeowner's" insurance as it were pick up the cost of the repair in addition to any downtime?
has the revenue declined due to the settlement? if it has, then what does the time matter? if it has not, why not do the work in september, after the major tourist season?
another thought, with the higher gas prices, will business decrease anyway? will it pencil out in the future as a hotel?
mike mccann
mmc engineering
if there are water, natural gas or other utilities entering the building through the foundation, i think you have no choice but to disconnect these pipes to lift a building 8-12". leave the means and methods of executing the work to the contractor and let him make the call on this.

i agree - i would be very wary of keeping this "open" during this phase. too many things can and often do go wrong. and the noise and dust will not be nice.
construction workers generally start at 7, would you be happy being woken at 7 on your holiday?
that said, if all noisy work was done between 10 and 4 then it may be feasible only to vacate the adjacent rooms.
it is important to note in correspondence that this is not your call.
thank you everyone for the responses. all were basically where i was headed with the project. thank you for the back up.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
problem, dilemma and solution huangyhg 产品功能分析 0 2009-09-15 02:53 PM
pre-engineered metal building engineer sse or ser huangyhg 产品功能分析 0 2009-09-15 02:08 PM
metal building manufacturers huangyhg 产品功能分析 0 2009-09-10 01:36 PM
metal bldg drift w brick veneer huangyhg 产品功能分析 0 2009-09-10 01:34 PM
glazing in non-windbourne debris areas huangyhg 产品功能分析 0 2009-09-09 02:42 PM


所有的时间均为北京时间。 现在的时间是 01:48 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多