几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:48 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pricing for repeat use of tract home design

pricing for repeat use of tract home design
hello:
most of my residential engineering design work has been for custom homes. i have a developer that would like to start using me for engineering on their tract (semi-custom) home designs. in other words, the house will be designed once, and built multiple (repeated) times.
my question is, since the home will be constructed multiple times, and since the building department needs structural calcs on each home as their being built (for each street address), how do you price the repeat designs and calculations.
since the design has already been done, what is the typical pricing structure for repeat design and analysis on the same basic house?
thanks,
h.e.
i worked for a company that did all the tract home designs in houston, like david weekely, dr horton, etc and they charged like $75 for each reprint, but we didn't have to provide calcs with those
i used to work for a firm that did alot of that type of work. each reuse was $150 charge within the same subdivision. each recieved a "site specific" foundation plan for the permit process. that was in 2000.
for repeat work that doesn't change (appreciably) i charge 1/2 fee for the second and 1/3 fee for each subsequent application. i also don't reduce my fee predicated on there being a large number of repeats; i only reduce my fee on subsequent buildings as noted above.
dik
my experience is similar to dik. when we do a building we charge full price for the first. 1/2 price for the second. and 1/4 price for all after that. if there are changes to the design or as codes change we negotiate that separate.
thanks alot folks. that is very helpful in determining our pricing structure.
h.e.
i did this last year for lennar - i got $2,000 per model for the first set of plans and am supposed to get $200 every time the model is rebuilt. i did not have to provide calcs - this is drawings only. but they did expect 4 different sets for each model - two different elevations and each reversed. then each of those needed to be produced in pdf, dwg and dwf formats.
it's good in one respect - it's like royalties on a design - but it was a pain to keep track of. they don't have any system to get me my reuse fees so i have to be the one to go figure out when each one is being built. also, they came back after the fact and wanted to reduce all the footings, rebar and shear walls (high wind and seismic zone). and finally, because of the market, the last set i designed are not going to get built near the volume that they promised - was supposed to be 80 and now they're trying to sell the lots.
i would never do this again... in fact, i don't do residential any more at all.
the liability for the "repeated" structures is the same as the first one. the fees for the "repeated" designs should account for the liability not just the amount of time spent preparing the documents again.
ask the developer how much of a discount they will give you if you buy three homes in the development versus one; then give them the same discount on your fee.
structures33... i always make sure the plan is for a particular address. i've been burned the same way... only once, though...
dik
archeng59,
you are exactly correct. in fact, one thing that you must think about is, if there is a lawsuit for one of the home designs, then there is a possibility for you to be liable for every home in the subdivision.
if you are successful with the design, you are successful multiple times. but, god forbid, if you make an error, then the error is also repeated multiple times.
i have thought to hire an outside firm to do a peer review on the designs to get another set of eyes on the plans to help eliminate errors being duplicated throughout the subdivision.
just something else to think about.
h.e.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
in a design and built contract,i ha huangyhg 产品功能分析 0 2009-09-09 07:16 PM
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 03:11 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多