默认 prestressed augercast soldier pile

restressed augercast soldier pile
anyone have any success or experience in using a special design of sequentially prestressed augercast soldier pile instead of the normal wide flange sections or tiebacks, including soil nailing?
have a project where no tiebacks can be used and i am trying to minimize, or eliminate entirely, the use of interior rakers in the pit - three to four story cut.
i anticipate gradually prestressing the piles with multiple tendons, strategically placed in the 30" diameter pile, as the excavation progresses to avoid tension in the concrete, enabling the use of the gross i section for lateral deflection.
any thoughts?
mike mccann
mmc engineering
i guess this is something either new or not used much if at all. thanks.
mike mccann
mmc engineering
i would contact vsl. if something has been done with prestressing, its likely they have done it.
if you are in the us, we have found vsl's houston office to be quite helpfull on a lot of issues involving prestressing/post-tensioning.
although i don't get involved personally, prestressing cocnrete piles is standard practice for geotech engs here in new zealand... very commonly done, and quite successful. as i understand it there are dangers involved if the pile is not braced by soil around it, so i am not certain the application is a fit...
also, just for your information, i believe the piles typically have a single, central, debonded prestressing cable and rather than a group. if you like i can have a word with a buddy in geotechnical group and see what he says.
cheers,
ys
b.eng (carleton)
working in new zealand, thinking of my snow covered home...
youngstructural:
yes, could you please - our geotech has not heard of such an application, yet. and he is very experienced - could be the economics here. nevertheless, i want to know oneway or the other. thanks.
mike mccann
mmc engineering
hello mike;
sorry, i should have warned you, but this is a long week-end in nz. i've just checked my posts and seen your's now... i'll talk to one of the boys tomorrow and let you know.
cheers,
ys
b.eng (carleton)
working in new zealand, thinking of my snow covered home...
i ran some quick numbers and it seems like i would have to use 30" diameter pile to be feasible to do this for the loads i am seeing, considering f'c = 5000 psi concrete and an uncracked section. seems like it should work for a cantilever of 20 feet or so, depending on the lateral soil loads, but not much greater if at all. still, i would be able to eliminate the top set of rakers. question is, is it economical considering the extra labor and another discipline...
mike mccann
mmc engineering
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
precast pile connection to pile cap huangyhg 产品功能分析 0 2009-09-15 02:22 PM
pile design load factors huangyhg 产品功能分析 0 2009-09-15 12:24 PM
h piles - end bearing huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile huangyhg 产品功能分析 0 2009-09-09 03:39 PM
augercast pile reinforcemen huangyhg 产品功能分析 0 2009-09-07 01:54 PM


所有的时间均为北京时间。 现在的时间是 08:46 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多