几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:13 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 precast conc. pile connection for gravity load

precast conc. pile connection for gravity load
what are your thoughts for not connecting a precast concrete pile to the pile cap when the loads are gravity only. i'm working on a design/build project and the contractor want's to save money by eliminating the epoxy anchors typically required to connect the two systems. i currently show the detail with a 6" embedment and no rebar to connect the two. i'm in a high seismic zone so i'm a little concerned about the lateral.
tia
check out our whitepaper library.
surround the upper tip of the pile with the reinforcing grid, place bottom steel 3" clear of bottom of cap and thus contain the pile.
don't know why you are talking about epoxy anchors. the way you connect precast concrete piles to the pile cap is to break out the concrete of the top of the pile and use the pile reinforcement to tie the two elements together.
hokie66,
interesting thought. how do you work with the prestress tendons after they are exposed? i seems like it would be easier to cut the entire pile off and then come back and drill & epoxy. this give you something nice and clean to work with but really i cannot say since i'm not a contractor and you have used this detail because this is what the contractor wants. if you had say a 50kip tension pile, do you think you could still use this type of detail? is this a standard detail from pci?
str04,
sorry, i should have told you that i am commenting from an australian perspective. most of our precast piles used in building work are reinforced with deformed bars rather than strands. so the typical detail is to saw around the pile, break out the remainder, bend the bars if required, and construct the pile cap. yes, 50 kip tension can be taken in one of these piles.
having said that, there are plenty of buildings on timber piles, and probably some on concrete piles, without positive connection of the piles to the pile caps. i think that would be a definite no-no in high seismic areas.
few years back, university of south carolina, columbia, sc did some experimantal program to study how does the plain embedment of prestressed piles into the footing or caps behave. you can find a copy of this report in july-august, 2001 pci journal.
their recommendation was, if the piles need to develop their nominal moment capacity, their plain heads need to embedded about 12" into the footings of caps.
hope this helps.
i am currently working on a project where we are using concrete filled pipe piles with a seismic design category of "c". ibc 2003 section 1808 specifies the seismic design requirements of pile connections to pile caps for different types of piles based on your seismic design category. if you are to conform to ibc i suggest you read this.
what if you're in the state of california and the code (2001 cbc) doesn't state the specific requirement? i know the new 2007 cbc will reference ibc but for now i'm stuck between a design/build contractor and my boss.
if you have no guidance legally, listen to the man (or woman) who signs your check.
if they want to eliminate the epoxy anchors, then make them provide something else. i would tell them you have to have something and ask what they would prefer to what i have shown. you can't just take out something you specified or you'll get hammered for over designing. they could question every little thing after that and say you're just overdesigning and costing them money, such-and-such needs to be removed. even if it works, make them change/add something.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pile design load factors huangyhg 产品功能分析 0 2009-09-15 12:24 PM
partition live load huangyhg 产品功能分析 0 2009-09-15 11:35 AM
moving point load huangyhg 产品功能分析 0 2009-09-10 03:22 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM
effects of a load on sog and below grade huangyhg 产品功能分析 0 2009-09-08 09:45 PM


所有的时间均为北京时间。 现在的时间是 01:48 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多