几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:05 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pre-cast concrete piles

pre-cast concrete piles
i'm looking into different options for my pre-cast piles.
one is by using pre-stressed concrete piles and the other is by conventional (using rebars only) reinforced concrete piles. both piles are designed to maintain the required capacity.
specifically, i would like to know:
a.)advantages and disadvantages between the two schemes.
b.) would the method of driving differ between the two schemes?
c.) would it be advantageous to use pre-stressed? in what way?
hope for your prompt reply. thanks.
check out our whitepaper library.
to the best of my knowledge, precast concrete piles (using only rebar) have been out of favor in the usa for over 50 years. driving equipment and techniques were the same as prestressed concrete piles. they were often cast, on the jobsite, by the project contractor, in forms that he had constructed. many times he even mixed his own concrete, on the jobsite, from the basic ingredients (sand, stone, cement & water).
by the 1950's better highways & larger trucks made delivery of prestressed products practical.
precast piles had a tendency to crack (no tension strands to "squeeze" the concrete together). of course this could allow water to enter to corrode the rebar.
one seldom used, but unique advantage of a precast pile, was the opportunity to include an axial steel pipe in the pile interior. then, in sandy soil, all the contractor had to do to jet the pile was to connect a pump to the pipe.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
【转帖】error c2664 yang686526 DirectDWG 0 2009-05-05 09:34 AM


所有的时间均为北京时间。 现在的时间是 07:58 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多