默认 pile to base slab connection

pile to base slab connection
simple question. (or maybe not) is it acceptable to have an auger cast pile that is not "sunk" into the base slab but merely connected to the base slab via hooked rebar? do any of the codes prohibit a flush connection when both components are cast in place?
check out our whitepaper library.
what鈥檚 the 鈥渂ase slab鈥? pile cap? not to my knowledge any code prohibits flush connection between pile and pilecap. with flush connection you have less connection fixity (this may not be a problem for a slab). for good fixity, sunken connection is more popular.
one aspect of "sinking" a pile may be similar to what happens with drilled piers. usually, the top few inches of a drilled pier have very rough finishes, if any at all, with even dirt or debris mixing in with the top strata.
i used to have a note requiring the contractor to place concrete in the piers to a level 2" higher than required, and then later chip off the top 2" to remove this "bad concrete".
for an auger cast pile, the top strata of concrete/grout can be loose, higher in water content (due to rising water) and may be damaged by subsequent excavations around the pile top. sinking this in a cap of concrete for 4 to 6 inches simply helps confine this concrete and minimizes crushing and settlement.
the base slab is 24" thick cast-in-place r.c. the drop cap is 24"x24"x4" thick. i do not need to rely on the piles for any fixity. they are only required to take a lateral seismic load of a little over 2 kips. i was going to transfer this lateral force via hooked bars. it will keep things simpler in the field if i can avoid having to clean out around the piles to create the sunken condition. i just wanted to be sure i wasn't missing some code requirements.
thanks for the response.
good point jae, i will check with the pile installer to see what their procedure is regarding the preparation of the top of the pile.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
h pile huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
cip pile tension connection to base slab huangyhg 产品功能分析 0 2009-09-07 11:40 PM


所有的时间均为北京时间。 现在的时间是 03:40 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多