默认 pci connection details

pci connection details
hi,
the pci connections manual shows a detail for connecting a precast column to a footing using a socket which the column sits in and is grouted. no shear connectors or bars which extend out of the concrete.
i am in a seismic area and while i don't have any net direct tension in my columns i'm a bit concerned but not having a positive connection.
i've been searching the pci design manual and aci for recommendations on minimum connection requirements but haven't found anything.
the contractor certainly prefers this connection detail compared to bolting or welding the column to the footing via embeded plates.
am i being too cautious here? any thoughts
thanks
a typical detail that we used (and can be found on page 5-28 of the 2nd edition of the pci design handbook) had a typical foundation detail (embed bolts, concrete ties, etc) as if for a steel column. a steel baseplate was cast to the bottom of the pre-cast column (it was attached to the precast column by rebar welded to the face of the base plate which extended up into the precast column and lapped with the main bars in the column). the base plate could be oversized so that the anchor bolts were outside the footprint of the precast column so the nuts could be installed without interference or they could be located within the footprint of the precast column and the bottom edges of the column blocked out to allow nut installation. haven't worked with precast in awhile so i'm not sure if the detail occurs in a more recent edition of the reference. in the end, the connection was as if you were erecting a steel column.
that connection is still found in the 6th addition of the pci handbook and a design example is given in section 6.12. this is a good connection if you need significant uplift or moment capacity from the connection. if all you are trying to do is provide code required continuity, steel embeds in the column and footing connected by weld angles is cheaper with greater erection tolerance. in sds d and above you cannot use the socket because it does not meet the minimum continuity requirements.
i'm also familiar with the connection like a steel column connection.
the advantage though of the socket type detail is the higher moment capacity at the base on the connection.
the structure in question sits on these columns and has no shear walls and in essence will function as a cantilever column system.
are you in a seismic area?
i design mostly in sds d and here we need to have a continuity tie to the footing. you could probably meet that requirement by casting a shear lug in the socket and the sides of the column below the pour back but i have never done that.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
odd beam to column connection 9steel0 huangyhg 产品功能分析 0 2009-09-10 04:54 PM
hss to hss shear connection details huangyhg 产品功能分析 0 2009-09-09 06:08 PM
degree and quality of details huangyhg 产品功能分析 0 2009-09-08 05:04 PM
contract issues - structural steel connection design in the huangyhg 产品功能分析 0 2009-09-08 01:40 PM
connection details huangyhg 产品功能分析 0 2009-09-08 01:13 PM


所有的时间均为北京时间。 现在的时间是 05:56 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多