几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 10:54 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 osha 3146 guardrail system question

osha 3146 guardrail system question
we have been asked to provide a cable guardrail system for a steel erector. the system will be up only for the steel erection and floor construction and then it will be taken down. my design will require fastening the cable to a clip angle at the columns and then to intermediate vertical members (angles welded to the bent plate at the edge of the floor slab).
what kind of connector should be used at the column. can the cable be tensioned accurately with a turnbuckle?

yes. a properly sized turnbuckle will work fine for this application.
right, but you do not want the cables to be "tightened" so much that they have no flexibility.
a cable that is "infinitely" tight cannot deflect outward and form the horizontal catenary that actually will support the man (the sideways load) who is leaning against the cable. (obviously, too loose and the cables cannot hold a person in against his falling forces - so there is a balance needed.) you want just a little bit of wiggle room over the length of the cable.
as a guard rail, the top cable needs to be 42" above deck level. check for a 4" toe board at the bottom also.
a handrail (at the stairs) needs to be also provided +36" above the nose of the steps, ending with a 12" horizontal extension at the top and bottom - for final access. don't know if that handrail extension is req'd for temporary construction stairrail though.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
ibc osha stairs huangyhg 产品功能分析 0 2009-09-09 06:35 PM
drawing number system - do you still indicate dwg sie in the huangyhg tec-ease(America) 0 2009-09-05 10:30 AM
[求助]遍历图块中子图元时,提取子图元的点数据如何不对 yang686526 ObjectARX(AutoLISP) 0 2009-04-22 07:46 PM
如何得到MessageBox窗口里的提示文本? huangyhg vc编程 1 2008-07-24 01:07 AM
【转帖】续实例解析socket编程模型之异步通信篇 yogy C# 1 2007-08-01 03:01 PM


所有的时间均为北京时间。 现在的时间是 04:42 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多