maximum span.
does anyone know where i could find out the maximum span of an unsupported 215mm masonry wall. the wall would be supported only at its ends and would be tied into other walls at those ends.
imagine the floor the wall was on 'disappearing'.
thanks
matt.
in the us, this is a function of many factors such as:
1. vertical gravity loads (deal and live)
2. eccentricity of the gravity loads
3. lateral loads (wind and seismic)
4. the wall end/boundary conditions (pin/pin, fixed/pin)
5. building code requirements (local, national, and aci, etc.)
6. strength of masonry, type of bond, type and strength of mortar.
i do not think you will find a chart that says certain size masonry wall will span so much without due consideration to the bullets mentioned above.
msfire, don't you think it may create problems regarding earthquakes to have a masonry wall which is not supported by a beam at the bottom along its length?
umitk2211
hi
the question arises when the composite floor the wall is normally sitting on sags due to a fire below heating the supporting beams. the performance of the wall at this point is being investigated.
i suspect the wall will arch, however is there any supporting documentation you are aware of for this case?
thanks
msfire
even unreinforced masonry can arch under right conditions. in old masonry buildings you frequently can see the masonry over window and door openings cracked starting at the jambs and stepping up at approximately 45 degrees meeting in the middle (forming a triangle). that happens when the lintel is not stiff enough. frequently lintels are designed to support only the triangular portion of the masonry. some engineers use the 45 degree others a 60 degree angle. the triangle usually is assumed to be placed above the lintel, which comes into play with masonry or concrete lintels. the assumption is that the lintel will support only loads that fall within this triangle. the masonry above the triangle arches over this, and by doing so develops a thrust. in order for masonry to be able to arch, this thrust will need to be resisted. see
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
maximum span length for pre-stress concrete box birder huangyhg 产品功能分析 0 2009-09-10 01:24 PM
max sdi construction span huangyhg 产品功能分析 0 2009-09-10 01:14 PM
long span composite beam - advice requested huangyhg 产品功能分析 0 2009-09-10 11:32 AM
exceeding maximum unsupported span of metal deck huangyhg 产品功能分析 0 2009-09-09 08:47 AM
allowable maximum span for three side-by-side 2x12s - reside huangyhg 产品功能分析 0 2009-09-07 11:01 AM


所有的时间均为北京时间。 现在的时间是 04:35 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多