几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 11:13 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 load testing for concrete bridges

load testing for concrete bridges
i am looking for a method or peice of equipment to use to determine whether or not an existing concrete bridge (built in 1921) will carry up to 40,000 lbs. any ideas?
thanks, doug

aci has a general method for performing a full scale load test on a concrete structure. i had one conducted in 1990 on a building that had a "hard life". you apply load up to high percentage (about 90%, based on memory) of (carefully) calculated ultimate strength. we used sand about 4 feet deep (with geotechs monitoring in-place density) for the load. a qualified testing firm monitored deflections. see the aci code for current information.
i have done about half a dozen full-scale, static or rolling load tests on bridges and parking decks. the process we use is to instrument the bridge with strain gages and deflection measurement devices (lvdt's or digital dial gages), then use an "overloaded" dump truck or similar to create as close to a "standardized" load as practicable (h18, h20, etc), run multiple tests and compare the data with computed stress distributions and deflections from a structual model of the bridge. the most difficult part is modeling an old bridge because it's difficult to determine how it was constructed unless you have the validated drawings.
with the field information, we can also determine the structure's "global" response to load and usually assess its capability and viability.
mwest, some more details would be very helpful.
i guess you have a bridge without a certified capacity and no as-con drawings to calculate a capacity or unsufficient justification to assess the bridge's capacity. do you have to allow for general traffic loads or a single movement (a loaded truck over a private bridge perhaps)? your approach may vary, depending on the circumstances.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
load rating of existing bridges huangyhg 产品功能分析 0 2009-09-10 11:09 AM
load distribution to three supports due to concentrated load huangyhg 产品功能分析 0 2009-09-10 11:04 AM
load combination questionpoll huangyhg 产品功能分析 0 2009-09-10 11:01 AM
effects of a load on sog and below grade huangyhg 产品功能分析 0 2009-09-08 09:45 PM
drilled piers and load testing huangyhg 产品功能分析 0 2009-09-08 07:46 PM


所有的时间均为北京时间。 现在的时间是 03:13 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多