默认 high bid gets the mn bridge projec

high bid gets the mn bridge project
$234 million!! high bid wins...go figure.
that's a huge difference between technical scores. wonder what you get from those low bids where the technical scores were much, much lower?
can someone explain to me what technical score is?
never, but never question engineer's judgement
a technical grade is supposed to be an objective scoring of a bid based on specific technical factors in the proposal. each rfp is different, so a score has no meaning outside of that particular rfp.
points are given for having proposal sections that cover specific items requested. obviously, there are always subjective undertones, but with a large enough review group, consensus can usually be achieved on the score to give for each section.
ttfn
not only was the high bid selected but the most construction days! moreover, technical scores ranged from 97-55 with 97 going to the high bid and tie for longest construction duration....that helped win the bid, of course, but is extremely rare!!
technical points are assigned for, in this case,
50% quality,
20% aesthetics,
and the remaining 30% made up of public relations and stuff along that line. to call it technical is really a misnomer.
you can find this out at the mndot website.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
this sounds awful quick to me considering what took place, even considering the fact that it is a major artery - 4 weeks to design and bid for a structure this complex ??????????????? seems super quick. politically quick if you don't mind me saying so. i hope they know what they are doing. is that an oxymoron or what - politicians knowing what they are doing?
is this a design-build contract?
mike mccann
mccann engineering
yes, it is design-build.
well, now there are the low bidders complaining about it:
as a resident of minnesota i am not happy with the dot's selection of the high bidder. the decision appears to be based on politics, not on the bidders ability to replace the bridge. i believe that the high bidder was selected because the dot felt they had the resources to sell the project, while the other bid refelcted those companies ability to build the project.
since the bridge has fell down this has become a political football. at first the dot was trying to quickly replace the bridge to restore traffic flow on i-35. the next thing that happens is that the mayor is pushing for a light rail lane, other groups for a bike path while others want to make an architectural statement.
there has been a lot of speculation on what caused the bridge to collapse. the cause was politicians spend tax money on stadiums and their other pet projects instead of providing the funds needed to maintain bridges and roads.

without going into the details of the technical rating system, it appears that the "selected" proposal was geared for the needs of the project and costs to accomplish this were built into the proposal. i do not know what the early completion bonuses will do to the total cost, but the bonuses can easily be justified easily in terms of cost to the state in terms of loss of time, commerce, traffic problems on other alternate routes, etc.
it is surprising how large the difference in technical scores were. apparently, the selected firm has had more experience on this type of project and was able to present themselves well in the context of the proposal requirements. the firms not selected have had a good history in the classic "design, low bid and build according to the plans" method, but unfortunately may not have looked as close at the proposal requirements and opportunities.
it is also interesting that there was little mention of the selection method at the beginning of the process. - i guess it would have been bad news for a politician to make comments before an event (selection), when it is safer after the event.
i guess the public arena is geared for the "boy scout" method of design, low bidder and force compliance and has a difficult time using some of the tools private firms have when they hire contractors that are not the low builder. they can choose designer/builders can give better performace/product and more flexibility for the money within the scope of the project needs.
i agree with rarswc. mndot was pressured by many interest groups but also was pressured to not let "low bid" and "fast completion" yield to 'cheap' and 'quick' as they may trump safety.
the technical score was subjective and we won't really know anything about it until or if the documents are released that give an idea as to what really happened.
and lastly from a bird's eye view, allocation of tax payer money for corporate welfare or other pet projects always trumps infrastructure.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
china bridge fails huangyhg 产品功能分析 0 2009-09-07 11:33 PM
building to bridge engineering huangyhg 产品功能分析 0 2009-09-07 05:43 PM
bridge loading factor huangyhg 产品功能分析 0 2009-09-07 05:12 PM
bridge collapse in mn part 2 huangyhg 产品功能分析 0 2009-09-07 05:04 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 07:00 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多