几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 03:43 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 hairpin detail for metal building

hairpin detail for metal building
does anyone have a hairpin detail to resist the lateral thrust from a metal building frame that gets installed correctly?
we are designing for new york state, so the piers and foundation walls are poured seperately from the slab on grade. we've done a few different iterations, including one we developed with a contractor's suggestions, but they never seem to get installed correctly.
thanks for your thoughts.
mark

yes; on a small building we will usually use hairpins, most often with turn down slab foundations. larger buildings will require cross building tie rods. i can send you autocad details. i don't know why you are placing your walls and piers seperatly?
the piers are poured integrally with the walls. the slab is poured at a later time. if we have hairpins sticking out of the piers, the contractor has a difficult time with backfill around the piers/walls before pouring the slab.
what do you use for cross building tie rods?
mark
some guys use pairs of lengths of welded re-bar to tie one pier to another across the building; some guys use a pair of threaded rods. you may have to thicken the slab to allow for the rods. talk to your metal building rep about rccomended details also. i'm not sure how to send information to
markmm,
what you describe is the way it is done, as far as i know. i suppose the hairpins do get in the way a little bit, but i don't see that as a big problem.
daveatkins
for cross ties, i use a concrete beam cast below the slab, similar to a grade beam but for the cross ties only. the beam is cast when the grade beams/footings are poured. the slab is placed later. i have not welded the cross tie bars together but use mechanical couplers when splices are needed.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
glazing in non-windbourne debris areas huangyhg 产品功能分析 0 2009-09-09 02:42 PM
florida building code partially enclosed v. enclosed huangyhg 产品功能分析 0 2009-09-09 12:54 PM
fibermesh metal building huangyhg 产品功能分析 0 2009-09-09 11:38 AM
building into a hillside huangyhg 产品功能分析 0 2009-09-07 05:39 PM
allowable high rise building drif huangyhg 产品功能分析 0 2009-09-07 10:58 AM


所有的时间均为北京时间。 现在的时间是 04:46 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多