默认 foundation and quarry blasting

foundation and quarry blasting
i need some answers,please. i am trying to fight a development which is being built on a mountain top. this site has very steep slopes.i will try and give you all information needed to answer my questions.soils:hibernia etra sandy loam,3-15%slopes(hpc),muck,shallow(ms); ridgebury extra loam,0-3%slopes(rba),3-8% slopes(rbb);riverhead sandy loam,3-8% slopes(rhb);rock outcrop rockaway complex, 15-35% slopes(rxe);and rockaway complex-rock outcrop, 3-15% slopes(rsc)-with exceptions of the roads,which occassionally cross steeper sloping portions of the site,the vast majority of the proposed construction will occur on areas of the site having slopes less than 15%. where required,steep slope areas will be graded to a shallower slope ratios to accomodate construction.
now on this same mountain ,about 1,500 to 2,000 feet away is an active quarry. this quarry blasts at least 2x a week. the homes that are not on this mountain feel the tremors and their homes shake. wouldn't there be adverse impacts to these new townhomes and their foundations?what could be the impacts? how could the foundations be made to with stand the quarry? should this applicant hire a geo-technical engineer? if so, please give reasons as to why. i am really trying to learn all information to make sure that the safety of the people that move into these homes are a priority. thank you so much!
check out our whitepaper library.
you have to design the houses agains earthquake. i don't know the magnitude of the wave and the energy dissipate in each blasting.
the thumb rule are in hard soil flexible structure in soft soil stiff structure. the reason: period of vibration in the soil never will merge with the period of the house.
the other way is install special devices to measure the aceleration of the wave its velocity and period is really expensive.
luck
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 03:25 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多