几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 11:46 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 filling an existing cmu wall

filling an existing cmu wall
i have an existing hollow cmu foundation wall with a substantial point load bearing on it. i want to fill the cores of the wall solid at these locations, but it's in a crawlspace, and there are many locations. i am aware of injecting on concrete to repair cracks, but is there anything similar to this that will fill in the cores solid without damaging the existing cmu's?
thanks
find a job or post a job opening
can you get access to the wall?
yon can remove a face shell at locations to be filled..
yes, you can access it through a crawl space. the contractor was trying to avoid installing temp posting in the finished 1st floor while he broke open the blocks. i was looking to find some sort of epoxy that could be pumped in a couple of 1"-2" holes in each core.
why can't you use a "pea gravel" (3/8" stone) mix and pump it into the cores through a 2" diameter hole with a standard grout pump?
for cmu foundation frost walls, is it normally required to fill all cells below grade with grout in a cold climate?
sorry, i meant my post to be a new thread. please ignore this post!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
existing wall footing modification huangyhg 产品功能分析 0 2009-09-09 09:01 AM
existing masonry wall and sliding foundation huangyhg 产品功能分析 0 2009-09-09 08:55 AM
existing - new basement wall connection huangyhg 产品功能分析 0 2009-09-09 08:50 AM
distressed cmu exterior wall huangyhg 产品功能分析 0 2009-09-08 06:59 PM
cmu filled opening in existing concrete wall huangyhg 产品功能分析 0 2009-09-08 09:31 AM


所有的时间均为北京时间。 现在的时间是 06:13 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多