elevated slab question
i am working with a residential design in a high wind zone area of north carolina. a common foundation type is an elevated slab. a common building method was to build a foundation wall made of brick on the outside with either a 4鈥?or 8鈥?inch block bonded on the inside. the brick is an integral part of the foundation wall, mortared and tied to the block (not a veneer). at the top of the wall the block is stopped and two additional courses of brick are laid. the slab is then ledgered on top of the top of the block wall up against the two courses of brick (with an expansion joint). the bricks then fully support a 2x4 wall. the building inspector has said that an engineered solution is not acceptable and that the top of the wall must be at least 6鈥?iaw the code. the 4鈥?brick fully support the loads of the structure and the design incorporates all of the high wind zone uplift requirements.
several different alternative options have been discussed but they seem to have other undesirable outcomes. one was to bring the block up flush with the brick but then to have a floating slab but up against the block. this results in the block being the first 4鈥?or 8鈥?of the floor (next to the exterior walls). if the slab ever settles (because it is floating) then you end up with an uneven floor.
does anyone have any suggestions for any other design approaches?
thanks
(below is a representation of the design)
(slab)
00000000000000** (brick)
00000000000000** (brick)
****** (block and brick)
******
******
******
****************** (footing)
******************
******************
check out our whitepaper library.
two possible methods;
- take the slab edge to the outside face of the brick, and extend the cladding down to cover the concrete.
- use 8" block to underside of slab and 4" block between the slab and brick. not a nice detail to try and achieve a flat floor, and the soft joint will have to be abandoned. to stop relative movement, reinforcement ties between slab and wall could be considered.
the building inspector's approach does seem narrow minded, especially if it is a tried and tested detail.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
elevated slab - concrete strength huangyhg 产品功能分析 0 2009-09-08 10:00 PM
elevated concretesteel beam garage slab design1 huangyhg 产品功能分析 0 2009-09-08 09:59 PM
effects of a load on sog and below grade huangyhg 产品功能分析 0 2009-09-08 09:45 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
concrete spec. for slab-on-grade huangyhg 产品功能分析 0 2009-09-08 12:49 PM


所有的时间均为北京时间。 现在的时间是 01:44 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多