几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 04:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 daylight basement elevated floor reactions

daylight basement elevated floor reactions
just wondering what other do here.
working on a project with a 13' tall daylight basement. the building is rectaugular, 140'x60'. really i have (4) shearwalls for earth loading on the 140 foot side, each wall is roughly 15' long.
the at service at rest pressure is really high at 65pcf. i started by designing the wall as a foundation wall (pinned at top) but that service reaction is 2700#/ft. to transfer that force i need a deck attachment of 2500#/ft (possible on an elevated composite slab but stretching the limit of the system). also i would need drags to transfer the force into the 15' walls, and that connection for drag force into the wall would be messy.
next option is to simply design the wall as a cantilevered retaining wall and not worry about transfering force into the slab, but my footing get to be large to stop sliding.
i know the obvious answer is to use soil nails or something, but i am wondering what others do in this situation, thanks
build a key under the cantilever retaining wall or thicken the footing for pressure on the non-retained face of the footing. analyze the shear walls as sharing the load with the cantilever footing (similar to a concrete buried tank with the edges and bottom fixed, top hinged or free).
i have used keys before and they help quite a bit for sliding. if you do design the wall as a cantilever, make sure that load does not get transfered floor/roof system as it will not be designed for that force. depending on your shear wall orientation, maybe consider designing the walls horizontally, not vertically.
in this case we typically (residential applications), design the wall as cantilevered with a key as necessary and ask that the backfill be compacted to 90% before the floor diaphragm is connected to the wall, if it is attached at all. also, your slab may be able to help you in the sliding problem.
can you analyze the wall as a rectangular plate fixed on three sides and free at the top? i just did that with a 15' tall fondation wall with soil pressures of 55 pcf.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cracks in new cmu basement wall huangyhg 产品功能分析 0 2009-09-08 02:27 PM
connection design at top of basement wall huangyhg 产品功能分析 0 2009-09-08 01:11 PM
basement walls huangyhg 产品功能分析 0 2009-09-07 02:36 PM
basement wall design huangyhg 产品功能分析 0 2009-09-07 02:35 PM
20 high basement wall and diaphragm huangyhg 产品功能分析 0 2009-09-07 08:23 AM


所有的时间均为北京时间。 现在的时间是 04:42 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多