几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 02:23 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 cracked drilled shaf

cracked drilled shaft
3 leg lattice communications tower, 450 feet tall supported on (3)- 6' to 8' diameter drilled shafts. each leg is supported on a base plate that is grouted with 4 anchor rods. the base plate is centered on the foundation. the drilled shaft appears to extend above grade approximately 12" to 18". one of the 3 shafts has cracked. the first crack is about 1" wide and is roughly a straight line that crosses the outside corner of the baseplate and is perpendicular to the diagonal of the baseplate. it extends from face to face of the shaft. the second crack is approx. 1/2" wide and is perpendicular to the first crack and starts at the outside corner of the baseplate and extends to outer face of the shaft. all i have are pictures right now, so i can't tell if the crack continues from top of foundation down past top of grade. i do see where concrete seeped out from under the formwork where the concrete was formed above grade. don't know much about this yet but wanted to see if anyone has seen this happen before. don't know the depth or cage size. do have pictures of a cage but can't confirm it was installed or even set at the right elevation.
check out our whitepaper library.
three each ties, (#4), required in the top five inches of foundation surrounding anchor bolts. when present, no cracks as described in my experience.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cracked and uncracked concrete1 huangyhg 产品功能分析 0 2009-09-08 02:22 PM
concrete cracked at service huangyhg 产品功能分析 0 2009-09-08 11:58 AM
circular tie details for drilled piers huangyhg 产品功能分析 0 2009-09-07 11:48 PM
appendix d method, anchoring to cracked concrete huangyhg 产品功能分析 0 2009-09-07 12:33 PM
下载好多软件 ping CAD资料交换区 6 2007-03-03 09:13 PM


所有的时间均为北京时间。 现在的时间是 04:06 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多