默认 concrete pile caps

concrete pile caps
as part of the on site qc team, i am concerned about thermal cracking in some up-coming pile cap pours which are over 10 ft thick, 15 ft wide and 20 ft long. however the designers have declared that these are not really mass concrete pours and no speacial precations need to be taken.
1. if none of the vertical faces are reinforced, does anyone know how much cracking we might expect if we start off with a concrete temp. of about 90 degrees.
2. if some of the piles are designated as tension piles, how will the tensile load transfer thru the pile cap to the column above without any vertical steel???
any comments would be helpful as the contractor & engineer of record don't seem very concerned about any of this.
check out our whitepaper library.
1. you can calculate the expected cracking based on the tensile strength of and differential temperature expected in the concrete, however this is overly conservative. there is some additional tolerance for cracking often provided by the use of large course aggregate (typically 75mm or larger on such a thick concrete pad. this also depends heavily on how they pour (ie: might not be a problem at all if poured in lifts which are allowed to cure and a ssd condition cold joint permitted).
if they are pouring in one hit (which would surprise me) or not making other allowances (such as ice instead of water), you probably have a problem. there's a good resource at my office that has a formula which may be applicable; let me know if you want me to look it up.
2. it will not, in my opinion. i am suprised you would still need tension piles with such a large cap; if the dead load is incufficient, you probably do need to insist upon reinforcement to lap through, at least enough to cause interaction of the lap zones.
cheers,
ys
b.eng (carleton)
working in new zealand, thinking of my snow covered home...
what is the magnitude of the uplift on the pile, i calculated the weight of the pile cap to be 2,000kn (470 kips). there would have to be a very large overturning moment on the structure to result in uplift.
thanks for your comments:
1 they plan to cast full height in one pour, which has me worried as well since they do not intend to take any precautions such as chilled water, ice or insulating blankets (nothing really).
2 i am not sure about the magnitude of the up lift since i was not envolved with the design, i just assumed there would be an uplifting force since they are requiring tension piles with dywdag bars & anchor plates at this location. however the anchors only extend about 2 ft into the bottom of the pile leaving nothing but the tensile strength of the concrete to transfer the load up to the column anchors above.
sorry if the 2cd sentence in # 2 confuses the issue, i meant to say that the achors extend only 2 ft into the bottom of the pile cap.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete pile caps to steel piles huangyhg 产品功能分析 0 2009-09-08 12:24 PM
concrete pile cap under hot tank huangyhg 产品功能分析 0 2009-09-08 12:24 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 08:05 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多