几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 12:10 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 concrete for clarifier for acid mine remediation

concrete for clarifier for acid mine remediation
i am designing a concrete clarifier and treatment tanks for the remediation of a stream with acid mine drainage. i have read the aci articles 201.2, 318, 350 & 1515. they offer general guidelines but do not offer any specifics as to when i need to provide a protective barrier. i know the concrete will be exposed to a moderate sulfate attack. the acid is sulfuric acid which is highly corrosive to concrete. what is the cut-off for providing a protective barrier for acid attack? i am specifying type ii cement for moderate sulfate exposure, w/c ratio = 0.45, and fly ash astm c 618 class f. is this enough? or, do i need a chemically resistant barrier instead? this is the chemical composition of the water that the concrete will be permanently exposed to:
ph = 2.6-4.5
acidity = 177.8-271.8 mg/l
fe (total) = 21.9-45.9 mg/l
al = 12.8-18.2 mg/l
mn = 1.2-1.5 mg/l
so4 = 334.2-535 mg/l

with the ph you noted and the fact that it is high in sulfuric acid, you need a barrier.
the sulfuric acid will severely attack the concrete, even with type ii cement.
you can line the clarifier (t-lock) or coat it. but nothing is fool or contractor proof.
i'm guessing someone in the mining business will have some better suggestions.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete failure along steel surface huangyhg 产品功能分析 0 2009-09-08 12:05 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
blinding concrete - specified grade huangyhg 产品功能分析 0 2009-09-07 03:56 PM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM


所有的时间均为北京时间。 现在的时间是 08:51 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多